54 Dulwich Village London Southwark SE21 7AJ
Listed building concent for erection of rear infill extension and adjustment of existing rear extension height. Replacement of the rear extension roof lantern with a low profile skylight and addition of 2 no. low profile skylights . Replacing 3 existing domed skylights with 2no. low-profile skylights to the existing front facing extension. Elevational repairs and upgrades including the re-rendering of the property with breathable lime render and addition of decorative mouldings. Replacement and repositioning of uPVC doors and windows with traditional style timber sash windows and timber doors and the reinstatement of a clerestory window. Roof alterations including the replacement of existing front ground floor extension with lead grey EPDM and rear extension roof with sedum, and replacement of felt and copper roof to the main property with a lead grey single ply membrane roof and the addition of 3no. conservation style skylights to the main roof. Internal remodelling works proposed.
Tuke School Daniel Gardens London Southwark SE15
Remodelling and extension of the existing Music room and adjacent spaces, to create a new classroom for 6-8 pupils at Tuke School. Proposals includes the addition of 17 m2, creating a new classroom totalling 89 m2. External works involve enlargement of the external play area associated to the classroom by 11.5m2, as well as creating additional external paved area for staff totalling 22.5m2. The proposed internal works involve the removal of existing partitions and the erection of a new wall to enclose the classroom from the main circulation corridor, together with the creation of a kitchenette, built in storage and a coat and store and full redecoration. Externally, the proposed new elevation is to match the existing, by using the same palette of materials and the same fenestration design, re-utilising the two existing windows and adding a new window, to the right hand side, to increase natural lighting within the space. New of PPC metal rainwater goods are to be added to either side of the extension, to drain the water collected on the new roof.