Shady Nook Norbury Hollow Road Hazel Grove Stockport SK7 6NE
Demolition of existing bungalow and garage and erection of replacement dwellinghouse and garage with associated works
Werneth View Glossop Road Marple Bridge Stockport SK6 5NX
Demolition of existing single storey bungalow and erection of replacement two storey dwellinghouse
1 Eaton Close Cheadle Hulme Cheadle Stockport SK8 5EU
Discharge of Conditions 2, 4, 5, 6, 7, 8, 9, 10, 12, 16, 17, 19 and 20 of DC/073373 for the erection of two dwellinghouses (Use Class C3(a)) with associated car parking, landscaping and boundary treatments, following demolition of existing bungalow.
11 Clement Road Marple Bridge Stockport SK6 5AF
Demolition of existing dormer bungalow and erection of a two storey dwellinghouse with associated landscaping
132 Woodford Road Woodford Stockport SK7 1PD
Demolition of single storey bungalow + associated garage, clearance of site and making good area with hardcore finish
3 South Meadway High Lane Stockport SK6 8EJ
Single storey side and rear extension following demolition of the existing garage with front, side and rear dormers extension. Rear balcony. New front wall and access gates Single storey side/rear extension, conversion of the bungalow to a two-storey dwellingvia the installation of dormers to the front, side and rear elevations, front porch canopy, new garden wall and gate, and rear balcony at first-floor level (amended description)
24 Oak Drive Bramhall Stockport SK7 2AD
Proposed demolition of existing single storey bungalow and garage and erection of 2 no. 4 bedroom semi-detached houses
9 High Lane Woodley Stockport SK6 1AZ
Demolition of existing bungalow and erection of replacement two storey dwellinghouse
87 Cavendish Road Hazel Grove Stockport SK7 6HU
Erection of a one-bedroom detached dormer bungalow (Use Class C3(a)) on land to the side and rear of 87 Cavendish Road, following the demolition of the existing garage, with parking for both dwellings, amenity space and boundary treatments.
1 Connor Way Gatley Cheadle SK8 4HF
Demolition of existing bungalow and site clearance. Erection of new-build 2-storey house including habitable roof / loft space.