Land At Welkin Mill Welkin Road Bredbury Stockport SK6 2BH
Development of a grid-scale battery storage project consisting of battery racks, inverters, transformers and other electrical plant equipment connected via an underground ducted cable to Electricity North West's distribution network at the Vernon Park Substation. Erection of secure compound enclosed by a 2.4m high security fence. A 6.0m high ball stopping net will be installed on the Western boundary of the site to prevent any footballs from landng within the boundary of the site from the adjacent football pitches.
Crucible Snooker Club Edward Street Stockport Stockport SK1 3DQ
Erection of a site fence with access gates to the boundary perimeter of a development site.
Bowling Pavillion Vernon Park Turncroft Lane Offerton Stockport
The proposed development seeks to fence the two bowling greens in Vernon Park with 1.8metre high fencing, total length 93.11metres (including gates).
18 Shaw Road Heaton Moor Stockport SK4 4AE
Retrospective change of use of existing strip of landscaping to be included within mixed use development adjacent and relocation of rear boundary fence