28 Meadows Road Heald Green Cheadle Stockport SK8 3RF
Single storey rear extension (permitted development rights), dormer extension and garage conversion to the existing property. New window to the front elevation and internal alterations.
102 Longhurst Lane Mellor Stockport Stockport SK6 5PG
Part first floor side extension and loft conversion with rear dormer (ordinarily permitted development)
8 Hattersby Lane Offerton Stockport Stockport SK2 5BF
Application for a Non-Material Amendment (NMA) to DC/066807 and DC/075497 - The creation of a new residential neighbourhood on the site of the Offerton Industrial Estate, formerly known as the Battersby Hat Works: comprising the demolition of a number of industrial structures, the conversion of two of the most significant retained structures fronting onto Hempshaw Lane, including facade retention in part and construction of new family homes behind the retained elements. In total 144 new dwellings (C3) will be provided. Ancillary to the residential use are a networks of roads etc. to serve the development, accessed from the improved junction with Hempshaw Lane.
1 Brighton Road Heaton Mersey Stockport SK4 2BE
Conversion of basement to habitable space, not to be separated from the original dwelling or to include any external changes (considered Permitted development) including amendment to the existing raised decked area to the side elevation
44 Blackberry Lane Brinnington Stockport SK5 8JZ
Conversion of green space to residents parking with associated landscaping works. Works include permeable drainage of the car park. This is as a result of the Countryside Development on the opposite side of Blackberry Lane.
Meadow Mill, Unit 1.10 Water Street Portwood Stockport SK1 2BX
Variation of conditions 1, 18, 21, 30, 33, 40 and 45 of planning permission ref: DC/063280 for "Conversion of part vacant Grade II listed former mill building into a mixed use development; comprising of 213 apartments on upper floors and 2208sqm of D2 (Leisure Use) and 200sqm A3 (Restaurant) use at ground floor level. Works include refurbishment and repair of the building, removal of existing roof and replacement of additional 7th floor in addition to upper floor extensions of the buildings northern and southern wings to accommodate additional 6th floors. Works to also include alterations to existing access, associated landscaping and creation of 173 car parking spaces within the buildings grounds. (Amended Scheme)" to authorise changes to the site access; changes to comply with Building Regulation Approved Document Part B - Fire Safety Volume 2 involving changes to the configuration of the fire escapes on the fifth floor roof level; changes to internal layouts; changes to windows and window openings; and the addition of a new electricity substation housed within an outbuilding.