Woodford Garden Village Development Woodford SK7 1ST
Discharge of condition 25 (phasing implementation), 27 (levels), 28 (materials inc hardsurfacing), 29 (lighting), 30 (refuse and recycling), 31 (travel plan), 32 (road infrastructure), 33 (surface water drainage system), 34 (hard and soft landscaping), 35 (replacement trees), 37 (ground conditions open spaces and playing fields), 46 (construction traffic management plan), 48 (archaeological measures), 52 (invasive species), 53 (foul and surface water), 54 (employment and training strategy), 57 (highways, footways, footpaths and cycle paths), 58 (visibility splays), 59 (cycle parking) and 60 (drainage and surfacing driveways) of planning permission DC/053832 in relation to Phases 3BDEF
188 Outwood Road Heald Green Cheadle Stockport SK8 3JS
Discharge of Conditions 4 (Access Details), 5 (Footway Reconstruction), 6 (Driveway Details), 7 (Electric Vehicle Charging), 8 (Cycle Parking),13 (Tree Planting),15 (Hard and Soft Landsacping) and 21 (External Lighting) of Planning Permission Reference DC/081193 for Demolition of existing dwelling and erection of a pair of semi-detached dwellings with associated access, landscaping and car parking.
1 Benja Fold Bramhall Stockport SK7 2BX
Discharge of condition 2 (materials), 3 (landscaping inc replacement tree), 9 (improvements to site entrance), 10 (driveway and parking), 11 (electric vehicle charging), 12 (cycle parking), 14 (compensation for bats and birds), 17 (boundary treatments inc hedgehog gaps, 19 (SUDS) and 20 (energy statement) of planning permission DC/077713.
51 Barcheston Road Cheadle SK8 1LJ
Discharge of Conditions 5 (Tree Planting and Biodiversity Enhancement Measures), 6 (Noise Report) and 7 (Surface Water Drainage Scheme) of planning permission reference DC/069504 for Erection of one two-storey 5 bedroom family dwellinghouse (Use Class C3(a)), with associated parking, landscaping and boundary treatments
Clarendon House 38 Carrwood Road Bramhall Stockport SK7 3LR
Discharge of condition 2 (demolition specification), 24 (landscaping inc replacement tree planting and the removal of Cotoneaster horizontalis), 28 (repeat daytime bat survey), 30 (badger protection measures) and 32 (surface water drainage scheme) of planning permission DC/073730.
Poynton Relief Road
Discharge of conditions 11 (Tree Planting), 24 (Landscaping) and 25 (Landscape and Ecological Management Plan) of planning permission DC063174
Woodford Garden Village Development Land Of Chester Road Phases 3A & 3C Stockport SK7 1QP
Discharge of conditions 25 (phasing strategy), 27 (levels), 28 (materials), 29 (lighting plan), 30 (refuse and recycling), 31 (travel plan), 32 (road infrastructure), 33 (suds), 34 (landscaping), 35 (replacement tree planting), 46 (construction traffic management plan), 48 (archaeology), 52 (invasive species), 53 (foul and surface water), 54 (employment and training plan), 57 (highways, footways, footpaths and cycle paths), 58 (visibility), 59 (cycle parking) & 60 (drainage and surfacing of driveways) of planning permission DC/053832 in relation to Phases 3A (Plots 457-487) & Phase 3C (Plots 488-554) only, approved under Reserved Matters Ref: DC/075318
6 Kings Close Bramhall Stockport SK7 3BN
Discharge of conditions 2 (materials), 3 (repeat bat survey), 4 (bat boxes), 7 (tree protection), 8 (method statement trees), 9 (landscaping), 11 (enclosures), 12 (construction method statement), 13 (access and harstsurfacing), 14 (evcp), 15 (cycle parking), 16 (SUDS), 19 (external lighting) and 22 (bins) of DC/074660
8 Highfield Parkway Bramhall Stockport SK7 1HY
Discharge of conditions 2 (materials), 3 (landscaping), 7 (construction method statement trees), 10 (construction method statement highways), 11 (driveway) and 14 (means of enclosure) of DC/071823
39 Hill Top Avenue Cheadle Hulme Cheadle SK8 7HZ
Discharge of conditions 2 (materials), 3 (landscaping), 7 (tree planting), 8 (access) 9 (driveway) and 12 (drainage) of planning permission DC070524