Land Off Hyde Road Within Woodley Primary School Woodley Stockport
Discharge of conditions 4 (proposed tree planting) and 6 (highway post construction survey) of planning permission DC/087049
Orrishmere Primary School Worcester Road Cheadle Hulme Cheadle Stockport SK8 5NW
Discharge of Conditions 3 (Surface Water Drainage), 5 (Land Contamination Investigation), 6 (Land Contamination Remediation), 8 (Landfill Gas Investigation), 22 (Tree Protection), 33 (Invasive Non-Native Species Protocol), 34 (Landscape and Ecological Management Plan) of Planning Permission reference DC/086026 for Public Service Infrastructure - Demolition of existing buildings on site and construction of a part-one, part-two storey SEN Secondary School with associated landscaping, MUGA, playspace and parking.
Land At Churchgate Churchgate Stockport
Discharge of Conditons 3 (construction management plan), 4 (pocket park construction management plan), 5 (highway survey and damage repair),17 (highway retaining wall details), 26 (satellite dish/aerial details), 33 (tree planting), 34 (archaeology), 36 (contamination site investigation), 37 (contamination remediation), 39 (landfill gas), 42( bat and bird roosting features) & 47 (landscaping) of planning permission ref: DC/078287
1 Albert Close Cheadle Hulme Cheadle Stockport SK8 5DG
Discharge of Conditions 3 (Construction Method Statement), 4 (Land Contamination Investigation), 5 (Land Contamination Remediation), 7 (Driveways and Access Details), 8 (Electric Vehicle Charging), 13 (Tree Planting), 14 (Materials) and 15 (Hard and Soft Landscaping) of DC/085324 for the Construction of 4 no. detached dwellings, associated access works, infrastructure and landscaping following demolition of the existing buildings on site.
St Philips Church 87 Aber Road Cheadle Stockport SK8 2EP
Discharge of Conditions 2 (Construction Method Statement), 3 (Surface Water Drainage Strategy), Condition 5 (Contamination Remediation Validation), 6 (Access Details), 7 (Car Parking Facilities), 8 (Footway Reconstruction), 9 (Electric Vehicle Charging Points), 10 (Cycle Parking), 11 (Addendum Noise Report), 14 (Tree Planting Details), 15 (Materials), 16 (Hard and Soft Landscaping) and 20 (Lighting Scheme) of planning permission reference DC/077299 for Demolition of church buildings and erection of 6 dwellings (2 detached dwellings and 2 pairs of semi detached dwellings) including vehicle parking, vehicle charging points, cycle and bin storage, boundary treatments and alterations to access
204 - 210 Wilmslow Road Heald Green Cheadle Stockport SK8 3BH
Discharge of Conditions 2 (Surface Water Drainage Scheme), 3 (Land Contamination Investigation), 4 (Land Contamination Remediation), 6 (Pre-Construction Road Survey), 8 (Carbon Reductions), 10 (Servicing Method Statement), 11 (Car Parking Facilities), 18 (Tree Planting), 19 (Materials) and 20 (Hard and Soft Landscaping) of Planning Permission reference DC/079400 for Demolition of existing buildings and erection of three storey building, providing for a Class E retail unit at the ground floor and eight residential apartments (Use Class C3) to the first and second floors, with associated vehicular access, car parking, servicing, cycle parking and wider associated works.
Land Off Duke Avenue Stanley Green Trading Estate Duke Avenue Stockport SK8 6RB
Discharge of Conditions 3 (replacement tree planting), 9 (invasive species), 10 (bat and bird boxes), 11 (infiltration tests/updated drainage strategy), 13 (contamination survey), 14 (remediation strategy), 18 (CEMP), 21 (construction method statement), 22 (turning head/access points), 23 (walkways), 24 (car parking/servicing), 25 (evcp), 28 (servicing method statement), 31 (lockers and drying facilities) and 32 (travel plan) of DC/080120
Woodford Garden Village Development Woodford SK7 1ST
Discharge of condition 25 (phasing implementation), 27 (levels), 28 (materials inc hardsurfacing), 29 (lighting), 30 (refuse and recycling), 31 (travel plan), 32 (road infrastructure), 33 (surface water drainage system), 34 (hard and soft landscaping), 35 (replacement trees), 37 (ground conditions open spaces and playing fields), 46 (construction traffic management plan), 48 (archaeological measures), 52 (invasive species), 53 (foul and surface water), 54 (employment and training strategy), 57 (highways, footways, footpaths and cycle paths), 58 (visibility splays), 59 (cycle parking) and 60 (drainage and surfacing driveways) of planning permission DC/053832 in relation to Phases 3BDEF
Robins Lane Bramhall Stockport SK7 2QB
T3315. Specifically the Acer psuidoplatanus The branches of T3315 that overhang Robins Lane are to be reduced by approximately 2 metres to allow access for construction purposes, the red line on the photo below illustrates the approximate reduction. The reduction is to be kept to the minimum necessary. All cut material/arisings to be chipped and removed from site. All tree works are to conform to BS 3998:2010 ???Tree Work??? Recommendations and to current arboricultural best practice. Tree works are to be undertaken by a professional and specialist arboricultural contractor, who carries the appropriate experience and insurance cover. TPO 84W, Tree G1
Woodford Garden Village Development Land Of Chester Road Phases 3A & 3C Stockport SK7 1QP
Discharge of conditions 25 (phasing strategy), 27 (levels), 28 (materials), 29 (lighting plan), 30 (refuse and recycling), 31 (travel plan), 32 (road infrastructure), 33 (suds), 34 (landscaping), 35 (replacement tree planting), 46 (construction traffic management plan), 48 (archaeology), 52 (invasive species), 53 (foul and surface water), 54 (employment and training plan), 57 (highways, footways, footpaths and cycle paths), 58 (visibility), 59 (cycle parking) & 60 (drainage and surfacing of driveways) of planning permission DC/053832 in relation to Phases 3A (Plots 457-487) & Phase 3C (Plots 488-554) only, approved under Reserved Matters Ref: DC/075318