Land On Former Car Park Of The Ship Inn 50 High Street Wolviston TS22 5JX
Information to discharge conditions no3 (Materials), no4 (Drainage), no5 (Levels), no6 (Arbocultural method statement), no9 (Construction Management Plan) and no10 (Landscaping - softworks) of planning approval 23/0060/FUL - Erection of 1no dwellinghouse with attached garage to include air source heat pump and photovoltaic panels together with associated landscaping, boundary treatment, car parking and widening of existing entrance. Erection of detached summer house and shed. Removal and minor works to trees
644 Yarm Road Eaglescliffe Stockton-on-Tees TS16 0DH
Information to discharge conditions no3 (Tree Protection), no4 (Materials and Method of Construction), no6 (External Lighting), no7 (Construction Method Statement), no10 (Surface Water), no12 (Ground Levels), no13 (Boundary Treatments), no15 (Fibre and Internet Connectivity) of planning approval 20/2217/FUL - Erection of 1 no. dwelling house with detached garage and associated access.
Vane Arms Darlington Road Long Newton Stockton-On-Tees TS21 1DB
Information to discharge condition no3 (Soft Landscaping), no5 (Materials), no6 (Site Levels), no7 (Boundary Treatment), no11 (Surface Water), no12 (Construction Method Statement), no13 (Tree Protection Plan), no15 (Lighting), no17 (Waste) of planning approval 20/0717/FUL - Erection of 1no 3 bedroom dwelling with associated access
Triangular Piece Of Land Bounded By Belasis Avenue/Central Avenue And Cowpen Lane (Former ICI Offices) Billingham TS23 1LA
Information to discharge conditions no6 (Tree Protection) and no8 (Construction Management Plan) of planning approval 20/1257/OUT - Outline planning permission with some matters reserved (Appearance, Landscaping, Layout and Scale) for the erection of buildings for office, research and development, manufacturing and storage (Use classes B1, B2 and B8) with associated boundary enclosure and the closure of part of Belasis Avenue. Identical application to one approved in 2019; permission sought for an extended implementation period