Land At Uptons Garden Whitminster Gloucestershire
Erection of 11 dwellings, access works, public open space, landscaping & associated infrastructure.
SKF(UK) Ltd Oldends Lane Stonehouse Gloucestershire GL10 3RH
Proposed commercial development comprising the construction of five new employment buildings & a total of seven units with a flexible Class E, B2 & B8 use as well as associated access, parking, landscaping & other ancillary works.
Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Land North East Of Draycott Cam Gloucestershire
Partial discharge of condition 26 (Adherence with Construction Env Mgt Plan) on PARCEL H2 ONLY - from S.15/2804/OUT (A mixed use development comprising of up to 450 dwellings, 10.7 hectares of employment land for Use Classes B1, B2 and B8 with associated parking and servicing; open space and landscaping including riverside park; flood storage ponds and infrastructure; creation of new vehicular accesses to Draycott (A4135) and Box Road and supporting infrastructure and utilities)
Rodborough Fort Rodborough Hill Stroud Gloucestershire GL5 5BL
New outbuilding including a swimming pool and associated landscape works
Rodborough Fort Rodborough Hill Stroud Gloucestershire GL5 5BL
New outbuilding including a swimming pool and associated landscape works
The Noddlings Bisley Road Stroud Gloucestershire GL6 7LH
Erection of a replacement dwelling, revised driveway, new landscaping and parking area.
Unit 1 Parcel E4 Land West Of Stonehouse Stonehouse Gloucestershire GL10 3XG
Discharge of conditions 4 (site waste), 8 (LEMP), 11 (highways 3) & 12 (highways 4) from the planning application S.21/2758/REM - Reserved Matters application for a proposed employment development (Class E(g), B2/B8) pursuant to outline planning permission S.14/0810/OUT including details of landscaping, design, scale, and layout. (description updated 13/04 to reflect outline permission)
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Discharge of Condition 4 (Landscape Ecological Management Plan) from S.22/1952/FUL (Proposed access and parking associated with the training pitches approved under application S.21/1739/FUL)
Wimberley Park Knapp Lane Brimscombe Gloucestershire GL5 2TH
Discharge of condition 13 (iii) (Contaminated Land) on Plots 1-71 from S.13/2668/OUT (Demolition and clearance of the existing buildings and hardstanding, residential development of up to 104 dwellings, vehicular and pedestrian access, Internal access roads, car parking, surface water drainage and related works, various engineering operations including changes to site levels, de-culverting the River Frome and works to create new flow and flood channels, associated landscaping including a play area. (Revised Plan 21st November 2014, revised description of development and plans 13.5.2015)