Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Littlecombe Zone E Lister Road Dursley Gloucestershire
Non-material amendment to the application S.20/2098/FUL (Residential development comprising 28 dwellings together with public open space, access, parking, landscaping and associated works) - amendment to retaining walls on plots 2-28 and house types on plots 20-28
Land South Of Haresfield Lane Hardwicke Gloucester Gloucestershire
Request for an EIA Scoping Opinion in respect of the Hunts Grove Extension site (allocated for development by Policy SA4 of the adopted Stroud Local Plan) The proposed development will be for a mix of uses including up to 710 residential dwellings, a primary school, public open space, play facilities, landscaping and supporting infrastructure
Parcel H2 Box Road Cam Gloucestershire
Amendment of Landscaping Drawings from original permission S.21/0971/REM - (Application for approval of reserved matters for the erection of 97 dwellings (including affordable housing), the identification of land for 6 self-build plots, drainage and other associated works and infrastructure in regard to S.15/2804/OUT)
Land Off School Lane Whitminster Gloucestershire
Environmental Impact Assessment. Residential development (up to 45 dwellings), associated infrastructure, ancillary facilities, open space and landscaping. Construction of a new vehicular access off School Lane.
Land South Of Grange Road Gloucester
Consultation request on- residential development comprising 250 dwellings (92 dwellings as built) with supporting infrastructure and enabling works including: access (as constructed), public open space, landscaping and drainage infrastructure with as built attenuation pond in north west corner of the site
Land To West Of Rodley Manor Way Land Between Lydney Bypass And Highfield Road Highfield Road Lydney
Approval of reserved matters (access, appearance, landscaping, layout and scale) of outline planning permission P0361/15/OUT to allow for No. 2 additional dwellings and re-plan of No. 5 dwellings
Land At Draycott Crescent Cam Gloucestershire
Scoping request for a residential mixed use development for up to 1,100 dwellings, new primary school, strategic landscaping and green infrastructure and other associated infrastructure.
Land Off School Lane Whitminster Gloucestershire
Screening Opinion to determine whether there is a requirement for an Environmental Impact Assessment (EIA) to accompany a planning application for up to 100 residential dwellings, associated infrastructure, landscaping and access. Vehicular access would be provided from School Lane