Rough Hill Cottage Wick Lane Stinchcombe Dursley Gloucestershire GL11 6BG
Demolition of modern additions & extensions. Refurbishment & extension of listed cottage. Reconstruction of dormer window.
York Cottage Chapel Hill Newport Berkeley Gloucestershire GL13 9PY
Erection of single storey extension and rear dormer. Revised plans received 17th August 2022
Extra Cover Far End Sheepscombe Stroud Gloucestershire GL6 7RL
Non-material amendment to permitted S.22/1256/HHOLD - Extend new dormer to rear/West side of house & minor widening of rooflights to front, East elevation, south end of roof plane
Old Post Office The Green Frampton On Severn Gloucester Gloucestershire GL2 7EY
Erection of a single storey rear extension and alterations including new dormer.
The Grange Park Lane Stancombe Dursley Gloucestershire GL11 6AY
Erection of single storey extensions, alterations to existing dormers and additional dormer, internal alterations and installation of ground source heat pump system
Cob House Slad Stroud Gloucestershire GL6 7QE
Resubmission of S.20/0345/LBC and S.18/1621/LBC to include extensions to rear and porch, internal alterations, reconstruction of chimney stacks, additional dormer to rear and redesign and relocation of garden room.
Chestnut Park Farm Charfield Road Kingswood Wotton-Under-Edge Gloucestershire GL12 8SL
Two additional doors on the rear elevation, conservation Velux windows on the existing extension roof, repairs to roof, construction of dormer windows to outbuilding, repairs to, walls and windows. Various internal alterations.
The Firs 118 Cainscross Road Stroud Gloucestershire GL5 4HN
Amendments to previously approved application S.17/0221/LBC. 1. Changes to internal layout to form 7 units rather than 8 units as previously proposed. 2. Changes to the layout of the previously approved new external metal stairs. 3. Extension of existing rear dormer (northwest corner). 4. Infilling existing windows in the rear extension on eastern elevation. 5. Alterations to window and door opening mainly to rear 1970s block. 6. Replacing existing uPVC windows with composite timber/aluminum windows and reinstating timber sliding sash windows in the original part of the building (ground floor and first floor). 7. Alterations to internal stairs and bulkhead with existing handrail moved to lower flight to be retained. Further alterations are proposed to the Partial sprinkler system, Acoustic and fire performance upgrade to intermediate floor/ceilings, Thermal upgrade to existing ground floor, Thermal upgrade to existing roof, Rendering rear block and External garden and parking.