The Licensee The Saltgrass Hanover Place Sunderland SR4 6BY
Construction of pergola over outdoor seating area, installation of storage container, external steps, external door and 1.1metre high block wall. (Retrospective)
Plots 16, 17 And 18 Former Vaux Site Riverside Sunderland
Construction of two new buildings for office use (Use Class E) with a range of ancillary uses (Use Class E/F.1/Sui Generis) and associated landscape works.
Land At Albany Park Spout Lane Washington NE37 2BZ
Construction of 76 dwellings, provision of open space and associated infrastructure. (Amended description, updated plans & reports)
Springwell Quarry Springwell Road Springwell Gateshead
The retention of the facility for the receipt, recycling, processing, storage and land filling of construction, demolition and excavation waste; storage of primary aggregate; production of concrete and associated ancillary activities at Springwell Quarry
Ashbrooke School Ashbrooke Road Sunderland SR2 7JA
Information to discharge condition 3. Construction Environmental Management Plan of planning approval 19/01651/FUL (1of6)
35 Pallion Park Sunderland SR4 6QE
Construction of an external bin store and drop kerb to facilitate access for refuse collection.
Land To The South Of Deptford Terrace/Hanover Place Sunderland
Construction of a 8MWe peaking power generation plant, with associated ancillary equipment, parking and access.
Penshaw Monument Chester Road Shiney Row Houghton-le-Spring
Non material amendment following approved application 19/01351/FUL (Footpath improvement works to Penshaw Monument hill) to allow construction of French drain alongside approved footpath improvements to assist site drainage.
Land At Castletown Way/Riverside Road Sunderland SR5 3JF
Discharge of condition 6 (Construction method statement) attached to planning application 14/00292/OUT.
Proposed Auditorium Old Fire Station Dun Cow Street Sunderland
Information to discharge conditions 3. Materials, 4. Auditorium Building, 5. Construction Environmental Plan, 6. Archaeological Fieldwork, 10. Deliveries, 15/16 Remediation Strategy/Verification and 19. Foul Surface & Water Drainage of planning approval 18/01514/VAR