Proposed Farnborough Civic Quarter Development Site Meudon Avenue Farnborough Hampshire
Consultation from Rushmoor Borough Council in respect of an outline planning application (with scale, layout, appearance and landscaping reserved for future consideration) for a mixed-use development, including demolition of all existing structures and erection of up to 1,006 residential units [Use Class C3] and non-residential floorspace comprising of the following mix of uses: leisure centre [Use Class E], hotel [Use Class C1], office floorspace [Use Class E], retail, commercial, healthcare, entertainment floorspace [Use Class E/Sui Generis] and community floorspace (including new library) [Use Class F1/F2]. Construction of two transport mobility hubs, associated infrastructure and highway works. Creation of new publicly-accessible open spaces including replacement skate park and associated access, servicing, landscaping and works
Frimley Park Hospital Portsmouth Road Frimley Camberley Surrey GU16 7UJ
Application to seek discharge of condition 2 (Asbestos Survey), 3 (Tree protection) 4 (Construction Management Plan) and 5 (Restoration scheme) of 21/0806/DEM Application under Class B, Part 11 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for the prior notification of the demolition of 2 no. non-clinical buildings known as Elm House, including the attached Bereavement Offices, and the IT/Training Building
McLaren Technology Centre Chertsey Road Woking Surrey GU21 4YH
Consultation from Woking Borough Council for a Section 73 application to remove Condition 3 (personal permission) of planning permission PLAN/2018/0114 (Section 73 application to vary Condition 4 (approved plans), to revise the parking configuration and phase implementation, of Planning Permission PLAN/2014/1297 for the development of an applied technology centre of 57,000sq m (G.E.A.) as an extension to the McLaren Production Centre, to include an aerodynamic research facility, workshops, research and development space, offices, meeting rooms, teaching and training space, vehicle preparation and assembly spaces, together with terraced car parking and two car park decks, cycle parking, a replacement helipad, and service areas. Associated earthworks and re-contouring of the open parkland, hard and soft landscape and infrastructure works, including an electrical substation and foul water pumping station and the temporary diversion of a public right of way during the construction of the development.)
Upper Longcross Chobham Lane Longcross KT16 0EE
Consultation from Runnymede Borough Council for a phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)