Armston Woodcote Drive Purley CR8 3PD
Demolition of the existing dwelling and the construction of a three-storey building to provide 8 no. flats comprising 5x 2 bed and 3 x 3 bed units together with the provision of 8 car parking spaces, cycle parking, waste collection facilities, external amenity space and landscaping (22/05258/FUL)
Armston Woodcote Drive Purley CR8 3PD
Demolition of the existing dwelling and the construction of a three-storey building to provide 9 no. flats comprising 3 no. two-bed flats and 6 no. three- bed flats together with the provision of 9 car parking spaces, cycle parking, waste collection facilities, external amenity space and landscaping. (22/03258/FUL)
Wandle Trading Estate Goat Road Mitcham Junction CR4 4HW
Application to vary conditions in relation to Phase 3 only of planning permission DM2018/01687 to allow for amendments to the implementation dates of conditions 1 (Materials), 10 (Contaminated Land Assessment), 15 (Construction Method Statement), 16 (Construction Plan), 18 (Archaeological Works), 19 (Archaeological Recording), 20 (Landscaping), 21 (Soft Landscaping and Biodiversity), 23 (Energy), 24 (Ecological), 26 (Piling) and 28 (Access).
17 Milton Avenue Sutton SM1 3QB
Erection of a part one, part two storey rear extension, involving alterations to existing roofline, including three dormer extensions to rear and conversion of the existing garage into a habitable area with associated alterations to front and rear fenestration. Construction of a detached outbuilding in rear garden, together with landscaping alterations.
Suez Resource Recovery Facility 79 - 85 Beddington Lane Sutton London CR0 4TH
Non material amendment to approved application DM2019/00863 which allowed the 'Proposed construction and operation of the Beddington Lane Resource Recovery Facility, comprising a main waste processing building, two storey administration and amenity building, weighbridge's with associated gatehouses, car park (50 spaces, including 3 disabled and 11 electric charging points), enclosed RCV fleet parking structure (14 Spaces), water tanks and associated pump house, vehicle refuelling area, two new accesses off Beddington Lane, highway improvement works to Beddington Lane, surface and foul water drainage infrastructure, vehicle circulation and manoeuvring space, soft landscaping and other ancillary infrastructure (including fencing, gating, mobile plant service bay, cycle store, smoking shelter and electrical sub-stations).,' to ammend condition 29.
79-85 Beddington Lane Sutton London CR0 4TH
Non material amendment to approved application DM2018/01865 which allowed the 'Proposed construction and operation of the Beddington Lane Resource Recovery Facility, comprising a main waste processing building, two storey administration and amenity building, weighbridge's with associated gatehouses, car park (50 spaces, including 3 disabled and 11 electric charging points), enclosed RCV fleet parking structure (14 Spaces), water tanks and associated pump house, vehicle refuelling area, two new accesses off Beddington Lane, highway improvement works to Beddington Lane, surface and foul water drainage infrastructure, vehicle circulation and manoeuvring space, soft landscaping and other ancillary infrastructure (including fencing, gating, mobile plant service bay, cycle store, smoking shelter and electrical sub-stations)'.