Land At The Quadrant Stonehill Green Swindon SN5 7HB
Discharge of conditions 3 (External Facing Materials), 4 (Arboricultural Method Statement & Tree Protection), 5 (Landscaping), 6 (Slab Levels), 7 (Ecology - Bat Boxes), 8 (Ecology - Bird Bricks), 9 (Ecology - Management Plan), 10 (Surface Water Drainage Scheme), 11 (Surface Water Drainage Maintenance Scheme), 13 (Construction Management Plan), 14 (Cycle Storage), 15 (Waste & Recycling Arrangements) and 16 ( Boundary Treatment) from previous permission S/19/1100.
Sparcells Drive Sparcells Swindon
Discharge of conditions 3 (Play Area), 4 (Drainage), 5 (Construction Method Statement), 13 (Boundary Treatments), 14 (Slab Levels) and 15 (Tree/ Hedge Protection) from previous permission S/18/0460.