Oakdale School And Acorn Nursery Cheetham Hill Road Dukinfield Tameside SK16 5LD
Internal Alterations & formation of new external fence with gate
17 Ainsworth Close Denton Tameside M34 2PZ
Proposed single storey rear extension and other external alterations including rear decking with glass balustrade and 2.1m fence along the side/rear boundary
24 Laycock Avenue Stalybridge Tameside SK15 3HG
Raised decking to rear of property with glass balustrade and other external alterations including external steps, wall and fence (retrospective)
19 Cambridge Drive Denton Manchester Tameside M34 2LY
Proposed single storey side extension and other external alterations including new close boarded fence and gates to the side elevation
Ashton Old Baths Stamford Street West Ashton-Under-Lyne Tameside OL6 7FW
Approval of details reserved by conditions 3 (mechanical and electrical services plant), 4 (replacement glazed tiles and window mouldings), 5 (secondary glazing to external windows), 6 & 7 (new rooflights) and 8 (brick walls Repair Method Statement) of listed building consent ref. 19/00791/LBC - Internal works, repairs, restoration and alterations of the Ashton Old Baths- Phase 2 Annex for the change of use from a storage and distribution ( Use class B8) to office accommodation ( B1), Coffee shop ( A3) and a new internal data centre by Sudlows (Sui generis) with supporting sub-station and generator compound externally with a fence enclosure
Ashton Old Baths Stamford Street West Ashton-Under-Lyne Tameside OL6 7FW
Internal works, repairs, restoration and alterations of the Ashton Old Baths- Phase 2 Annex for the change of use from storage and distribution ( Use class B8) to office accommodation ( B1), Coffee shop ( A3) and a new internal Data center by Sudlows (Sui generis) with supporting sub-station and generator compound externally with a fence enclosure. Secondary glazing submission, external lighting scheme to the Ashton old Baths building, signage to the new Ashton old Baths Entrance external area and retractable canopies with a new heating solution to the upper terrace decks of the existing Phase 1 pods