Willow View 126 Mottram Old Road Hyde Tameside SK14 3BA
Site investigation report and remediation strategy prepared by Wormseye Ltd date 28.07.2021.
Land Adjacent 5 King Edward Road Hyde Tameside
Discharge of condition 2 (materials) and condition 6 (CLS2A Contaminated Land Screening Form) of planning permission 16/00688/FUL
Former Globe Works Brook Street Hyde Tameside
Application to discharge conditions of approved application 18.00818.FUL (Demolition of existing buildings formally occupied by Globe Works and the construction of 37 dwelling houses and 6 apartments (43 residential units) with associated car parking and landscape works). Condition 7 - Photographic Survey (Highways delap survey) Condition 8 - Street Lighting Plan (Highways) Condition 13 - Existing Drainage Plan, Proposed Drainage Plan & Surface Water Drainage Catchment (LLFA, UU & EA) Condition 16 - Temporary Drainage Strategy & Plan (LLFA, UU & EA) Condition 17 - Existing Drainage Plan, Proposed Drainage Plan & Surface Water Drainage Catchment (LLFA, UU & EA) Condition 35 - Traffic Management Plan (Highways)
Former Globe Works Brook Street Hyde Tameside
Discharge of conditions applied to approved application 18/00818/FUL. Con3 - Geo Environmental Appraisal, Con 14 - Landscape and Ecological Management Plan & Badger Habitat, Con 15 - Invasive Plant Species Method Statement, Con 20 - Glazing Specification & NIA, Con 21 - Absorbent Sound Screen Spec, Con 24 - Landscape and Ecological Management Plan, Con 25 - Engineering Appraisal, Con 26 - Landscape Proposal, Con 29 - Brick Sample & Roof Tile Sample, Con 33 - Landscape and Ecological Management Plan, Con 34 - Cage Trash Screen Spec, Con 35 - Highway Works
Former Wharf Mill Dukinfield Road Hyde Tameside SK14 4RS
Application to discharge condition no.s 4 (Drainage), 7. (Remediation) and 8 (Protection measures to Peak Forest Canal) on full planning application 15/00631/ful
Land Off Swan Street To The Rear Of 16-28 Old Street Ashton-Under-Lyne Tameside
Application to discharge condtions of approved application: 20/00028/FUL 5 - Materials -Four Architects Materials Document 6 - Coal Mining Report - Geo Investigate Report. 8 - Surface Water Drainage Strategy - Bell Munro Ltd 10 - Remediation Strategy - Refer to No 6