Lanswood Park Broomfield Road Elmstead Essex CO7 7FD
Proposed construction of 4 bed dwelling, infill with development site.
723 Main Road Harwich Essex CO12 4LZ
Discharge of conditions 3, (Phase II Site Investigation Report) 5, (Construction Environmental Management Plan) 6, (Construction Management Plan) 7, (Scheme for the provision of electric vehicle charging facilities for each dwelling) 8, (Scheme detailing how a contribution towards the energy needs arising from the development can be achieved through renewable energy sources) 9 (Hard and soft landscaping scheme) and 10 (External materials and finishes) of application 21/00426/FUL.
Land West of Low Road Dovercourt Essex CO12 3TR
Proposed approval of the reserved matters of appearance, landscaping, layout, and scale following the grant of outline consent under application 17/02168/OUT for the residential development of 300 dwellings with public open space, vehicular access, and associated infrastructure, in addition to the approval of details reserved by Conditions 3 (phasing), 7 (local recruitment strategy), 9 (surface water drainage), 10 (construction surface water run-off), 11 (surface water drainage maintenance plan), 14 (landscape management plan), 15 (levels strategy), 16 (tree protection), 17 (ecological mitigation), 18 (public open space management plan), 20 (environmental construction management plan), 21 (contamination), 22 (foul water strategy), 23 (off-site highway improvements), 27 (bus stop improvements), and 28 (emergency access) of the outline consent.
Land to The South of Ramsey Road and East of Mayes Lane Ramsey Essex CO12 5EW
Application for reserved matters following approval of outline consent 19/00917/OUT for the development of 31 dwellings and 10 almshouse type bungalows for older persons and associated open space, incorporating details to discharge of conditions 8 (vehicular access - Ramsey Road), 9 (vehicular access - Mayes Lane), 11 (surface water discharge), 12 (estate roads and footways), 13 (construction method statement), 16 (landscape management plan), 22 (surface water drainage), 24 (archaeology) and 26 (construction phasing) of outline consent 19/00917/OUT.