Admirals Farm Heckfords Road Great Bentley Essex CO7 8RS
Discharge of conditions 3 (Details of an additional road calming measure), 5 (Detailed planting schedule for all planting within 35 metres of the entrance to the play area within 3 metres of the access road), 6 (Distance of 25 metres of forward visibility from Heckford Road up to the bend in the entrance road to the east), 7 (Details of a warning sign and sub-plate), 8 (Full details of the pedestrian dropped curb with tactile paving), 9 (Precise details of lighting, refuse storage/collection points and the types and colours of the fencing and gates materials for the play area, to be used in the construction), and 10 (Scheme of hard and soft landscaping) of approved application 21/00739/FUL.
Murray Hall Farm High Birch Road Weeley Clacton On Sea Essex CO16 9BU
Discharge of conditions 4 (Details of the provision, siting, design and materials of screen walls and fences) and 8 (Construction method statement) of application 20/01005/FUL.
Land East of Halstead Road Kirby Cross Essex CO13 0LR
Discharge of Condtions 5 (Details of estate roads and footways), 7 (Details of screen walls and fences), 8 (Details of surface water drainage works ) and 9 (Environmental Construction Management Plan ) of permission 19/00283/FUL
36 Jaywick Lane Clacton On Sea Essex CO16 8BJ
Discharge of conditions 10, (Residential travel information pack) 14, (provision, siting, design and materials of screen walls and fences) 15, (Scheme of hard and soft landscaping works) 18 (Details of the manufacturer and types and colours) and 23 (Construction Method Statement) of planning permission 20/01784/FUL.
Land Site of Former Martello Caravan Park Kirby Road Walton On The Naze Essex CO14 8QP
Discharge of conditions 3 (hard and soft landscaping), 5 (refuse facilities), 13 (phasing plan and programme), 14 (materials), 16 (boundary walls and fences), 23 (cycle parking) and 27 (construction method statement) of planning application 19/01116/FUL.
Land rear of Edward Street and Una Road Parkeston Essex CO12 4PS
Discharge of conditions 5 (Materials), 6 (Hard and Soft Landscaping), and 8 (Details of Siting, Design and Materials of Screen Walls and Fences), 12 (Flood Response Plan), 13 (Construction Method Statement), 14 (Details of Roads, Footways and Vehicular Access), 15 (Site Characterisation, Remediation Scheme, Implementation of Approved Remediation Scheme & Reporting of Unexpected Contamination), 17 (Bicycle Storage) and 18 (Construction Traffic Management Plan) of Planning Permission ref: 15/01792/OUT
Custom House Main Road Harwich Essex CO12 3PG
Discharge of conditions 4 (Construction Method Statement), 5 (Hard and Soft Landscaping), 7 (Materials), 12 (Acoustic Fencing) and 14 (Boundary Treatments) of Planning Permission Ref: 18/01083/FUL
683 St Johns Road Clacton On Sea Essex CO16 8BJ
Discharge of conditions 3 (roads and footways), 4 (walls and fences), 5 (hard and soft landscaping), 6 (construction method statement), 7 (vehicle turning facility), 16 (flooding), 17 (drainage) and 19 (materials) for approved application 18/00540/FUL.
46 Clarkes Road Dovercourt Harwich Essex CO12 4JX
Discharge of condition 3 (Screen Walls and Fences) and 4 (Construction Method Statement), of approved planning application 20/01071FUL.
Millets Thorpe Road Weeley Clacton On Sea Essex CO16 9JN
Discharge of conditions 2 (Materials), 3 (Landscaping), 5 (Fencing) and 9 (Construction Method Statement) of approved planning application 18/01839/FUL.