Martells Quarry Slough Lane Ardleigh Colchester Essex CO7 7RU
Proposed continuation of use of washing plant for the recycling of non-hazardous and inert wastes without compliance with Conditions 2 (Duration); 10 and 11 (Routing Restrictions/HGV Movements); and 19 (Restoration Scheme) of planning permission ESS/32/18/TEN ("the installation and use of a washing plant for the recycling of non-hazardous and inert wastes, the use of a crusher, the installation of a weighbridge office and relocation of a weighbridge together with associated access onto the highway") to extend the duration of development until 30th September 2041; increase waste imports and consequential HGV movements to 138 Monday to Friday, and 70 Saturdays and increase the maximum daily peak to 204 (reducing to 102 on Saturdays); increase use of the private haul road to 25 HGVs per hour and provide a Restoration and Aftercare scheme by 30th December 2037.