38 Third Avenue Frinton On Sea Essex CO13 9EE
(1) Arbutus Unedo - Cut back from garage roof. (2) Thuya - Remove. (3) Dead Trees (Unknown) - Remove. (4) Dead Pine - Remove. (5) Conifer - Remove. (7) Flowering Cherry Tree - Remove, diseased. (8) Bay Tree - Cut back from boundary.
Admirals Farm Heckfords Road Great Bentley Essex CO7 8RS
Discharge of condition 3 (Construction Method Statement), 4 (hard landscaping, ground levels and boundary treatments), 16 (Archaeological evaluation), 17 (Landscape and Public Open Space Management Plan including a lighting strategy), 18 (Surface Water Drainage Scheme), 19 (Scheme to minimise the risk of offsite flooding during construction), 20 (Surface Water Drainage system maintenance plan), 24 (Facing Materials and Roofing Materials), and 28 (on-site foul water drainage works) of application 21/01560/FUL allowed on appeal (under appeal ref APP/P1560/W/22/3297669).
Yew Tree Cottage 20 Brook Street Manningtree Essex CO11 1DR
Proposed demolition of rear single storey flat roof element and chimneystack. Partial demolition of northwest single storey outbuilding. Reconstruction of ground floor outbuilding range with pitched roof, repair and strengthening to retaining wall to northwest boundary, partial demolition of existing slate roof extension, erection of single storey extension, new door openings and fenestration changes, replacement windows, removal and addition of internal partitions, and levelling of basement floors. Demolition of existing garage and erection of new garage. Installation of new foul drainage pipework within front range to serve new bathroom to first floor, and adjustment of ground levels with steps to new courtyard.
78 North Road Clacton On Sea Essex CO15 4DF
Proposed conservatory roof height 3.5 metres within 2 metres of boundary (retrospective).
Froghoppers Lower Marine Parade Dovercourt Harwich Essex CO12 3SR
Proposed two storey front extension including first floor balcony; single storey side and rear extensions; and new roof including velux windows to existing dwelling. Erection of dwarf wall and metal railings and gate to front boundary (following demolition of existing front wall).
Yew Tree Cottage 20 Brook Street Manningtree Essex CO11 1DR
Proposed demolition of rear single storey flat roof and chimneystack. Partial demolition of single storey outbuilding. Reconstruction of ground floor outbuilding with room in roof extension over pitched and flat roof elements. Erection of single storey link extension, including new door openings, fenestrations changes, replacement windows and guttering and rainwater drainage. Demolition of existing garage and reconstruction of new garage closer to west boundary. Installation of photovoltaic panels to rear roof. Adjustments to ground levels on courtyard, including blockwork wall, tile coping and gate. Installation of replacement gate to end northwest range.
Yew Tree Cottage 20 Brook Street Manningtree Essex CO11 1DR
Proposed demolition of rear single storey flat roof and chimneystack. Partial demolition of single storey outbuilding and reconstruction of ground floor outbuilding with room in roof extension over pitched and flat roof elements. Erection of single storey link extension. Demolition of existing garage and reconstruction of new garage closer to west boundary.
The Coach House Colchester Road Thorpe Le Soken Clacton On Sea Essex CO16 0LA
Discharge of Conditions 3 (External Facing and Roof Materials), 9 (Construction Method Statment), 13 (Hard and Soft Landscaping) and 15 (Boundary Treatment) of Approved Planning Permission ref: 18/01348/FUL
29 Percival Road Walton On The Naze Essex CO14 8HH
Erection of single storey side and rear extension, second storey rooftop extension (following removal of pitched roof) and associated alterations to include roof terrace, installation of new front boundary wall and gate and changes to appearance (including render and fenestration).
18 High Street Manningtree Essex CO11 1AD
Installation of low-profile aluminium roof light, and boxing-in of exposed drainage pipework. Removal of two timber stud work walls to outbuilding. Installation of timber access gates in gap in boundary wall. Cladding another outbuilding with horizontal boarding. Replacement of existing external timber door affected by damp with new timber door to match adjacent door. Minor repairs to brick boundary wall.