5 Pheasant Close Barton Stacey Winchester Hampshire SO21 3SD
Demolish garage and lean-to, erect single storey rear and two storey side extension and addition of rear dormer
15 Gardeners Green Shipton Bellinger Hampshire SP9 7TD
Single storey front extension, loft conversion including rear dormer and associated alterations
6 Fairway Gardens Rownhams Southampton Hampshire SO16 8JJ
Two storey and single storey rear extensions and installation of dormer windows
29 Rownhams Lane North Baddesley Hampshire SO52 9HR
Demolition of conservatory, single storey side/rear infill extension, side dormer, porch and elevational alterations (amended scheme)
Grafton 151 Botley Road Romsey Hampshire SO51 5SX
Two storey side extension, dormer window, replacement side window and rooflight to rear bedroom and canopy to front entrance door (revised scheme)
Orchard House The Orchard Chilworth Hampshire SO16 7JZ
Demolish garage, upgrade front, side and rear elevations, extension to provide garage, utility, kitchen, 2 home offices with 2 bedrooms with ensuites over, extend plant room, and construction of dormer windows
Lynchet Fullerton Road Wherwell Andover Hampshire SP11 7JS
Erect two-storey side and rear extension, single storey garage and studio/office, convert garage to living space, replace windows and doors including addition of dormer, roof lights and over clad finishes
Hill House The Hill Hurstbourne Tarrant Hampshire SP11 0AE
Demolition of side extension and rear canopy and erection of single storey rear and side extension; demolition of existing wc dormer and extension to existing Bed 1 dormer; new dormer window to Bed 3; larger window inserted to Bed 3; new front entrance (side extension) with Boundary wall re-instated
The Old Forge The Dene Hurstbourne Tarrant Hampshire SP11 0AG
Raise roof of side extension to provide additional bedroom accommodation including two dormer windows
Martins Horsebridge Road Houghton Hampshire SO20 6LY
Variation of condition 11 of 21/03673/VARS (Variation of condition 10 of 19/01615/FULLS (Two storey extension, garage conversation erection of new garage; construction of detached dwelling including package treatment plant) to allow enlarged footprint of dwelling and dormer to rear) to replace the proposed 'Bio-bubble' treatment plant with the existing Biotec P6 treatment plant to continue to serve the existing dwelling and to install a Klargester Bioficient treatment plant to serve the new dwelling