Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR
Application to discharge requirements in part for requirement 13 (archaeology) for the first phase of 300MW of battery storage with associated infrastructure and mitigation of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO)
Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR
Application to discharge requirement 3 (notice of commencement of the development) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the first phase of 300MW of battery storage with associated infrastructure and mitigation.
Land At 13 Loewen Road Chadwell St Mary Essex
Discharge of Conditions 8 (Parking Spaces Numbering) and 9 (EV Charging Points) of planning application 21/00894/TBC: Demolition of existing property and the construction of a new residential development consisting of 4 dwellings (100% Affordable Housing), with associated landscaping, car parking and cycle parking
Thurrock Flexible Generation Plant Fort Road Tilbury Essex
Application to discharge requirements in part, for requirements 4 (detailed design); 10 (surface water drainage); and 14 (landscape and environmental management plan) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the first phase, to provide 300MW of battery storage with associated infrastructure and mitigation.
Thurrock Flexible Generation Plant Fort Road Tilbury Essex
Application to discharge requirements in part, for requirements 5 (code of construction practice); 6 (construction traffic management plan); 7 (construction worker travel plan); 17 (local employment and skills strategy) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the first phase of 300MW of battery storage with associated infrastructure and mitigation.
Thurrock Flexible Generation Plant Fort Road Tilbury Essex
Application to discharge requirements in part for requirement 13 (archaeology) for the first phase of 300MW of battery storage with associated infrastructure and mitigation, and discharge in full requirement 16(3) (noise monitoring) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO)
Fearings Farmhouse Church Road Corringham Essex SS17 9AP
Application for the discharge of condition No.4 (Submission of Arboricultural Method Statement) of planning permission ref: 21/01814/HHA (Proposed new vehicular crossover and associated operational development including modifying existing close boarded fence and insertion of matching height close boarded gates and verge reinstatement.)