Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR
Application to discharge requirements in part for requirement 13 (archaeology) for the first phase of 300MW of battery storage with associated infrastructure and mitigation of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO)
15 Crouch Road Chadwell St Mary Essex RM16 4BX
Application to Discharge Conditions 8 (Boundary Treatment and Hard and Soft Landscaping) and 12 (Details of Access) in relation to permission ref. 22/00754/FUL [Construction of a 3 Bedroom detached dwelling with associated hardstanding, fenestration alterations to existing dwelling and creation of new vehicular access.]
Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR
Application to discharge requirement 3 (notice of commencement of the development) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the first phase of 300MW of battery storage with associated infrastructure and mitigation.
Land Adjacent Masefield Road Properties Blackshots Stadium And 44 Stanford Road Grays Essex
Application for discharge of planning condition 16 (Noise Management Plan) of planning permission ref: 21/01309/FUL [Development of a new secondary school with associated sports facilities, access, parking, highway improvements, landscaping and ancillary works]
Berth 40A Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7EH
Application for the discharge of condition no 6 of planning permission ref: 22/00466/FUL (Construction and operation of a cementitious products manufacturing facility)
Land At 13 Loewen Road Chadwell St Mary Essex
Discharge of Conditions 8 (Parking Spaces Numbering) and 9 (EV Charging Points) of planning application 21/00894/TBC: Demolition of existing property and the construction of a new residential development consisting of 4 dwellings (100% Affordable Housing), with associated landscaping, car parking and cycle parking
Thurrock Flexible Generation Plant Fort Road Tilbury Essex
Application to discharge requirements in part, for requirements 4 (detailed design); 10 (surface water drainage); and 14 (landscape and environmental management plan) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the first phase, to provide 300MW of battery storage with associated infrastructure and mitigation.
Unit 255 Lakeside Shopping Centre West Thurrock Way West Thurrock Essex RM20 2ZQ
Application for the discharge of conditions no 12 (surface water drainage strategy) of planning permission ref: 21/02158/FUL (Full planning application for car park alterations including a new access point, alterations to the servicing and waste strategies, shop front alterations including signage zones, and replacement plant.)
Unit 255 Lakeside Shopping Centre West Thurrock Way West Thurrock Essex RM20 2ZQ
Application for the discharge of conditions no 10 (external lighting) of planning permission ref: 21/02158/FUL (Full planning application for car park alterations including a new access point, alterations to the servicing and waste strategies, shop front alterations including signage zones, and replacement plant.)
Thurrock Flexible Generation Plant Fort Road Tilbury Essex
Application to discharge requirements in part, for requirements 5 (code of construction practice); 6 (construction traffic management plan); 7 (construction worker travel plan); 17 (local employment and skills strategy) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the first phase of 300MW of battery storage with associated infrastructure and mitigation.