Barton Swing Aqueduct Bridgewater Canal Towpath Manchester M41 7LG
Cross Boundary Full Planning Application between Salford City Council and Trafford Council to provide a foot/cycle link across Barton Swing Bridge Aqueduct. Salford City Council: provision of an access ramp with gate, reinstatement of elevated foot/cycle link attached to, and repairs/maintenance to the Barton Swing Bridge Aqueduct, erection of new foot/cycle bridge over Barton Lane, the reinstatement of foot/cycle path across Upper Pocket Park, tree removal, and landscaping works (soft and hard). Surface and access improvements to existing and new sections of the towpath, reprofiling levels, other landscaping improvements, and associated pedestrian and cycling improvements / signing and lighting works, together with enabling works. Trafford Council: provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs/maintenance to the Barton Swing Bridge Aqueduct. The demolition of no. 1a and 2a Chapel Place, and metal gazebo structure. Surface and access improvements to existing and new sections of the towpath, landscaping works (soft and hard), including tree removals, and other landscaping improvements, retention and formalisation of existing operational parking spaces, and associated pedestrian and cycling improvements / signing and lighting works, together with enabling works.
Bridgewater Canal Barton Aqueduct Barton Lane Eccles
Article 16 consultation in relation to 21/77583/LBC. Cross Boundary Full Planning Application between Salford City Council and Trafford Council to provide a foot / cycle link across Barton Swing Bridge Aqueduct. Salford City Council, provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct, erection of new foot / cycle bridge over Barton Lane, the reinstatement of foot / cycle path across Upper Pocket Park, tree removal, and landscaping works (soft and hard). Surface and access improvements to existing and new sections of the towpath, reprofiling levels, other landscaping improvements, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works. Trafford Council: provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct. The demolition of no. 1a and 2a Chapel Place, and metal gazebo structure. Surface and access improvements to existing and new sections of the towpath, landscaping works (soft and hard), including tree removals, and other landscaping improvements, retention and formalisation of existing operational parking spaces, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works." Listed building consent is sought for:"The re-instatement of a canal towpath to the Barton Swing Aqueduct and associated fixings together with other supporting works."
Bridgewater Canal Barton Aqueduct Barton Lane Eccles
Article 16 consultation in relation to 21/77582/FUL. Cross Boundary Full Planning Application between Salford City Council and Trafford Council to provide a foot / cycle link across Barton Swing Bridge Aqueduct. Salford City Council, provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct, erection of new foot / cycle bridge over Barton Lane, the reinstatement of foot / cycle path across Upper Pocket Park, tree removal, and landscaping works (soft and hard). Surface and access improvements to existing and new sections of the towpath, reprofiling levels, other landscaping improvements, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works. Trafford Council: provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct. The demolition of no. 1a and 2a Chapel Place, and metal gazebo structure. Surface and access improvements to existing and new sections of the towpath, landscaping works (soft and hard), including tree removals, and other landscaping improvements, retention and formalisation of existing operational parking spaces, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works." Listed building consent is sought for:"The re-instatement of a canal towpath to the Barton Swing Aqueduct and associated fixings together with other supporting works."
42 Fownhope Avenue Sale M33 4RH
Application for non-material amendments to 96189/FUL/18 including changes to approved main roof slopes to account for reduced central low pitched roof element, change to the external wall of the front facing bay window between ground and first floor windows from brickwork to render, mullions either side of central bay window to be thicker to accommodate steel posts to ground and first floor, change of brickwork on front gable elevation wall above bay window to render, replace hip tiles with lead roll at south west hipped edge of two storey rear extension, removal of several non-protected trees along back garden's side boundary, removal of low rise wall within back garden and installation of 1.8m high fencing along back garden's side (south-west) boundary in part to replace the removed trees as new boundary treatment at this point.
48 Moss Road Stretford Manchester M32 0AY
Erection of a single storey rear extension to create a new open plan kitchen with external alterations and erection of a new rear boundary fence section, following removal of existing trees within rear garden
Former Health Centre Central Road Partington
Application for approval of details reserved by conditions of grant of planning permission 98728/FUL/19. Condition number 3 - (Affordable Housing), 8 - (Landscaping/Trees Maintenance), 10 (Management & Maintenance Plan (SUDS), 14 - Lighting Plan, 15 - (Landscaping - Boundary Treatments), 23 - (Waste Management).
18 Lime Grove Timperley WA15 6PJ
Works to trees within TPO 289, specifically, the re-pollarding of 1 Lime (T1) on the boundary between 18 and 20 Lime Grove, to previous pollard points
1 Bow Green Road Bowdon Altrincham WA14 3LZ
Demolition of existing dwelling and garage, erection of replacement dwelling with double garage connected with glazed link. Associated works include new entrance gates and piers, replacement low timber boundary fence. Removal of trees and planting of new trees and boundary hedgerow, hard and soft landscaping.
Cap Gemini House 77 - 79 Cross Street Sale M33 7HG
Application for approval of details reserved by conditions of grant of planning permission 101754/FUL/20. Condition numbers: 3 (materials), 4 (parking-cycle/motorcycle), 5 (bin stores), 6 (Elec Vehicle Charging Points), 7 (Landscaping - boundary), 8 (Landscaping - trees) and 9 (Biodiversity enhancement).
26 Lime Grove Timperley WA15 6PJ
Works to trees within TPO 289, specifically, a crown reduction of 1 Lime (located on the boundary of no. 26 & no. 28) by a maximum of 3m.