Barton Swing Aqueduct Bridgewater Canal Towpath Manchester M41 7LG
Cross Boundary Full Planning Application between Salford City Council and Trafford Council to provide a foot/cycle link across Barton Swing Bridge Aqueduct. Salford City Council: provision of an access ramp with gate, reinstatement of elevated foot/cycle link attached to, and repairs/maintenance to the Barton Swing Bridge Aqueduct, erection of new foot/cycle bridge over Barton Lane, the reinstatement of foot/cycle path across Upper Pocket Park, tree removal, and landscaping works (soft and hard). Surface and access improvements to existing and new sections of the towpath, reprofiling levels, other landscaping improvements, and associated pedestrian and cycling improvements / signing and lighting works, together with enabling works. Trafford Council: provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs/maintenance to the Barton Swing Bridge Aqueduct. The demolition of no. 1a and 2a Chapel Place, and metal gazebo structure. Surface and access improvements to existing and new sections of the towpath, landscaping works (soft and hard), including tree removals, and other landscaping improvements, retention and formalisation of existing operational parking spaces, and associated pedestrian and cycling improvements / signing and lighting works, together with enabling works.
Bridgewater Canal Barton Aqueduct Barton Lane Eccles
Article 16 consultation in relation to 21/77583/LBC. Cross Boundary Full Planning Application between Salford City Council and Trafford Council to provide a foot / cycle link across Barton Swing Bridge Aqueduct. Salford City Council, provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct, erection of new foot / cycle bridge over Barton Lane, the reinstatement of foot / cycle path across Upper Pocket Park, tree removal, and landscaping works (soft and hard). Surface and access improvements to existing and new sections of the towpath, reprofiling levels, other landscaping improvements, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works. Trafford Council: provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct. The demolition of no. 1a and 2a Chapel Place, and metal gazebo structure. Surface and access improvements to existing and new sections of the towpath, landscaping works (soft and hard), including tree removals, and other landscaping improvements, retention and formalisation of existing operational parking spaces, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works." Listed building consent is sought for:"The re-instatement of a canal towpath to the Barton Swing Aqueduct and associated fixings together with other supporting works."
Bridgewater Canal Barton Aqueduct Barton Lane Eccles
Article 16 consultation in relation to 21/77582/FUL. Cross Boundary Full Planning Application between Salford City Council and Trafford Council to provide a foot / cycle link across Barton Swing Bridge Aqueduct. Salford City Council, provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct, erection of new foot / cycle bridge over Barton Lane, the reinstatement of foot / cycle path across Upper Pocket Park, tree removal, and landscaping works (soft and hard). Surface and access improvements to existing and new sections of the towpath, reprofiling levels, other landscaping improvements, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works. Trafford Council: provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct. The demolition of no. 1a and 2a Chapel Place, and metal gazebo structure. Surface and access improvements to existing and new sections of the towpath, landscaping works (soft and hard), including tree removals, and other landscaping improvements, retention and formalisation of existing operational parking spaces, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works." Listed building consent is sought for:"The re-instatement of a canal towpath to the Barton Swing Aqueduct and associated fixings together with other supporting works."
Holly Tree Farm Clay Lane Timperley Altrincham WA15 7TS
Application for Certificate of Lawful Development for demolition of buildings at Holly Tree Farm
1 Bow Green Road Bowdon Altrincham WA14 3LZ
Demolition of existing dwelling and garage, erection of replacement dwelling with double garage connected with glazed link. Associated works include new entrance gates and piers, replacement low timber boundary fence. Removal of trees and planting of new trees and boundary hedgerow, hard and soft landscaping.
Whitewell 4 Broadway Hale Barns WA15 0PQ
Application for Variation of Condition 2 on planning permision 96956/FUL/19 (Demolition of existing dwelling and garage, erection of replacement dwelling with attached garage incorporating balcony to side elevation at first floor level, including integrated landscape proposals.) to amend the position of the existing entrance to safeguard existing mature Copper Beech tree.
Urmston Leisure Centre Bowfell Road Urmston M41 5RR
Application for variation of conditions 2 and 12 on planning permission 95501/FUL/18. (Demolition of existing single storey element to front elevation of Urmston Leisure Centre, erection of two-storey extension incorporating fitness suite, studios, member changing, party rooms, climbing wall, cafe, kitchen and rooftop plant, erection of bin store and removal of trees externally). To amend approved plans and parking layout.