Keepers Cottage, Thorley Lane, Manchester,WA15 8UQ
Article 16 consultation from Manchester City Council (reference 131651/FO/2021) Erection of a two storey building to provide 10 additional hotel rooms, reception area and managers flat with associated parking facilities.
7 Chandler Close Manchester M22 5GU
Article 16 consultation from Manchester City Council in relation of application 132264/FH/2021 - Erection of a single storey rear extension to form additional living accommodation.
New Lawrence House, 2 Shawheath Close, Manchester, M15 4TL
Article 16 consultation from Manchester City Council (reference 132302/P20A/2021) in relation to a Prior approval for the erection of 33 no. 1 and 2 bed apartments within a two storey rooftop extension.
Land Bounded By Dinton Street, Cornbrook Road, Chester Road And Trentham Street, Manchester, M15 4FX
Article 16 consultation from Manchester City Council (131163/MO/2021) in relation to Reserved Matters Application for the approval of appearance, layout, scale and landscaping, following the approval of outline permission referenced118625/FO/2017 for the erection of a part 11, part 15 building to form a 154 bed hotel and 88 bed apart-hotel building (Use Class C1) with associated public realm, car parking, and other associated works following demolition of existing buildings
219B Upper Chorlton Road Manchester M16 0DE
Article 16 consultation from Manchester City Council in relation of application 131341/FH/2021 -Part retrospective application for the erection of 1st floor side and rear extension together with single storey rear extension to form additional living accommodation.
Derwent Street Salford
Article 16 consultation from Salford Council (reference 20/76384/FUL) for erection of 17 storey building comprising 160 residential units, ancillary gym and communal space together with improvements to the public realm, landscaping, car parking and associated works.
Land At Woodhouse Lane East Timperley
Erection of a proposed 15m Phase 8 Monopole C/W wrapround Cabinet at base and associated ancillary works. (Notification for prior approval under Part 16 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015).
Bridgewater Canal Barton Aqueduct Barton Lane Eccles
Article 16 consultation in relation to 21/77583/LBC. Cross Boundary Full Planning Application between Salford City Council and Trafford Council to provide a foot / cycle link across Barton Swing Bridge Aqueduct. Salford City Council, provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct, erection of new foot / cycle bridge over Barton Lane, the reinstatement of foot / cycle path across Upper Pocket Park, tree removal, and landscaping works (soft and hard). Surface and access improvements to existing and new sections of the towpath, reprofiling levels, other landscaping improvements, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works. Trafford Council: provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct. The demolition of no. 1a and 2a Chapel Place, and metal gazebo structure. Surface and access improvements to existing and new sections of the towpath, landscaping works (soft and hard), including tree removals, and other landscaping improvements, retention and formalisation of existing operational parking spaces, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works." Listed building consent is sought for:"The re-instatement of a canal towpath to the Barton Swing Aqueduct and associated fixings together with other supporting works."
Bridgewater Canal Barton Aqueduct Barton Lane Eccles
Article 16 consultation in relation to 21/77582/FUL. Cross Boundary Full Planning Application between Salford City Council and Trafford Council to provide a foot / cycle link across Barton Swing Bridge Aqueduct. Salford City Council, provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct, erection of new foot / cycle bridge over Barton Lane, the reinstatement of foot / cycle path across Upper Pocket Park, tree removal, and landscaping works (soft and hard). Surface and access improvements to existing and new sections of the towpath, reprofiling levels, other landscaping improvements, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works. Trafford Council: provision of an access ramp with gate, reinstatement of elevated foot / cycle link attached to, and repairs / maintenance to, the Barton Swing Bridge Aqueduct. The demolition of no. 1a and 2a Chapel Place, and metal gazebo structure. Surface and access improvements to existing and new sections of the towpath, landscaping works (soft and hard), including tree removals, and other landscaping improvements, retention and formalisation of existing operational parking spaces, and associated pedestrian and cycling improvements / signing and lighting works. Together with enabling works." Listed building consent is sought for:"The re-instatement of a canal towpath to the Barton Swing Aqueduct and associated fixings together with other supporting works."
New Lawrence House, 2 Shawheath Close, Manchester, M15 4TR
Article 16 consultation from Manchester City Council in relation to application (129429/P20A/2021) for Prior approval for the erection of 36 no. 1 and 2 bed apartments within a two storey rooftop extension