5 St Johns Road Royal Tunbridge Wells Kent TN4 9TN
Submission of Details in relation to Condition 3 - (External materials), 5 - (Details of windows, materials, external lighting, ground floor levels), 6 - (Code of Construction Practice), 7 - (Site contamination), 8 - (Internal ventilation system), 15 - (Vehicular crossing), 19 - (Telecommunication infrastructure), 22 - (Sustainable surface water drainage scheme), 24 - (Secured by Design initiative) of 21/04191/FULL
Hamilton Court Chilston Road Royal Tunbridge Wells Kent TN4 9LN
Prior Notification for erection of one additional storey to provide an additional 11 no. dwellinghouses on an existing detached block of flats building including other works proposed (a) engineering operations reasonably necessary to construct the additional storeys and new dwellinghouses (b) works for the replacement of existing plant or installation of additional plant on the roof of the extended building reasonably necessary to service the new dwellinghouses (c) works for the construction of appropriate and safe access to and egress from the new dwellinghouses and existing premises in the building, including means of escape from fire, via additional external doors or external staircases (d) works for the construction of storage, waste or other ancillary facilities reasonably necessary to support the new dwellinghouses. For its prior approval to: (a) transport and highways impacts of the development; (b) air traffic and defence asset impacts of the development; (c) contamination risks in relation to the building; (d) flooding risks in relation to the building; (e ) the external appearance of the building; (f) the provision of adequate natural light in all habitable rooms of the new dwellinghouses; (g) impact on the amenity of the existing building and neighbouring premises including overlooking, privacy and the loss of light; and (h )whether because of the siting of the building, the development will impact on a protected view identified in the Directions Relating to Protected Vistas dated 15 March 2012(1) issued by the Secretary of State. (Internal change and minor window adjustment to 22/02538/APA)
Land Rear Of 1 And 2 Montacute Gardens Linden Park Road Royal Tunbridge Wells Kent
Submission of Details in relation to Condition 3 - (External materials and fenestration), 4 - (Site contamination), 5 - (Sound insulation and noise reduction), 6 - (Air quality), 7 - (Disposal of surface water and sewage), 8 - (Construction management plan), 11 - (Ecological mitigation and enhancement), 12 - (Tree protection), 14 - (Landscaping scheme) of 20/00191/FULL
Conghurst Cottages Conghurst Lane Hawkhurst Cranbrook Kent TN18 4RJ
Submission of Details in Relation to Conditions 3 (Written Schedules of Work for Windows and Plaster Work), 4 (Full Details of Roof, External Openings, Floor Boarding, Joinery, Proposed Interface, Pipes, Rainwater Goods and External Pipework and Mechanical Ventilation), 5 (Plastering) and 8 (Full Details of Existing Roof Timber Construction as Affected by the Roof Light Installation) of 20/02082/LBC
Bradleys Mill Speldhurst Hill Speldhurst Tunbridge Wells Kent TN3 0NE
Submission of details in relation to Condition 3a (Roofs); Condition 3b (Roof); Condition 3d (Timber framing / floor construction); Condition 3e (Non timber floor construction); Condition 3f (Windows); Condition 3g (Doors); Condition 3h (Rain water goods / above ground drainage); Condition 3j (Timber Decay); Condition 4b (Weatherboarding); Condition 4c (Roof); Condition 6 (Leadwork) of 19/00044/LBC
Apple Tree Cottage Maidstone Road Horsmonden Tonbridge Kent TN12 8NE
Submission of Details on Relation to Condition 3 (Windows and Doors) and 4 (Porch Construction) of 20/02672/LBC.
25 Tunnel Road Royal Tunbridge Wells Kent TN1 2FN
Submission of Details in Relation to Conditions 3 (Code of Construction Practice), 4 (External Materials), 5 (Details of Fenestration, Doorway Design, Means of Enclosure, Refuse, Cycle Storage, External Lighting, Rainwater Goods), 6 (Sustainable Surface Water Drainage Scheme), 7 (Maintenance and Management Details of Sustainable Drainage Scheme), 8 (Details of Disposal of Foul Sewage and Surface Water), 9 (Hard and Soft Landscape Works), 11 (Noise Levels), 12 (Contamination Risk Scheme), 15 (Electric Vehicle Charging Point Details), 16 (Air Quality Control Scheme), 17 (Plant or Ducting System Details), 18 (Enhancement of Biodiversity Scheme), 19 (Off Site Work Details), 25 (Parking to be surfaced, drained and retained), 26 (Obscure Glazing), 27 (Renewable Energy Technologies), 28 (Water Conservation) and 29 (Energy Conservation) of 18/02404/FULL