Land East Of White Cottage Start Hill Great Hallingbury Hertfordshire
Application to discharge condition 7 (surface water drainage scheme), 12 (parking scheme), 15 (hard/soft landscaping), 17 (tree protection) and 18 (Construction Method Statement) attached to UTT/22/1719/FUL (approved under Appeal APP/C1570/W/3307086)
The Cottage Molehill Green Takeley Essex CM22 6PQ
Application to discharge conditions 5 (tree protection) and 6 (Arboricultural Method Statement) attached to UTT/20/0223/FUL
Building 800 Chesterford Park Little Chesterford Saffron Walden Essex CB10 1XL
Application to discharge condition 6 (tree protection) attached to UTT/22/1248/FUL.
Land South Of Radwinter Road (former Printpack Site) Saffron Walden Essex
Application to discharge condition 6 (tree protection), 10 (contamination), 17 (Service Management Plan) and 30 (Construction Management Plan) attached to UTT/20/2007/FUL.
Land At Lindsell Lane Lindsell Essex
Application to discharge condition 3 (tree and hedgerow protection plan) attached to UTT/22/2273/FUL.
Land West Of London Road Newport Essex
Application to discharge condtion 30 (tree protection) attached to UTT/20/2632/FUL
Eurowire Ltd Unit 2 & 3 Zone A Chelmsford Road Industrial Estate Dunmow Essex CM6 1HD
Application for discharge of condition 3 (fencing - tree protection) on application UTT/1595/11/FUL
Walden Place Freshwell Street Saffron Walden Essex CB10 1DQ
Application to discharge condition 2 (hard/soft landscaping), 4 (Archaeology), 7 (Biodiversity enhancement), 8 (lighting design scheme), 10 (electric charging points), 11 (tree protection) and 12 (materials) attached to UTT/20/3415/FUL.
Chesterford House High Street Great Chesterford Saffron Walden Essex CB10 1PL
Application to discharge condition 7 (Biodiversity enhancement layout), 10 (tree protection plan), 11 (hard/soft landscaping) and 14 (materials) attached to UTT/21/3373/FUL.
Land North Of Ashdon Road Ashdon Road Saffron Walden
Application to discharge condition 2 (materials), 3 (on-site foul water), 4 (surface water drainage), 14 (tree protection), 17 (construction management plan), 18 (construction traffic management) 19 (surface water infiltration), 20 (pollution control) and 22 (construction method statement) attached to UTT/20/0842/FUL.