Forge Cottage Duck End Stebbing Dunmow CM6 3RY
Proposed demolition of 2 outbuildings, construction of cart lodge, replacement windows and door with thermal upgrade works to existing rear extension
Forge Cottage Duck End Stebbing Dunmow CM6 3RY
Proposed demolition of 2 outbuildings, construction of cart lodge, replacement windows and door with thermal upgrade works to existing rear extension
Whitehouse Farmhouse Whitehouse Road Stebbing Essex CM6 3BY
Demolition of existing conservatory and existing single storey rear projection . Construction of two storey side extension and two storey rear extension.
Monk Street Stables Monk Street Thaxted Dunmow Essex CM6 2NR
S73 application to remove condition 3 (noise assessment) of UTT/23/1562/FUL (Proposed rear extension to dwelling approved (and under construction) under planning permission UTT/22/1619/FUL)
Land East Of St Edmunds Lane St Edmunds Lane Dunmow
Application to discharge condition 2 (house type, extension and/or garage options, layout, the materials to be used in the construction of the dwelling and landscaping for plot 13A ) attached to UTT/21/3563/FUL
Lea Hall Dunmow Road Hatfield Heath Essex CM22 7BL
Proposed construction of single storey orangery extension to rear elevation. Partial removal of 1920's fabric and removal of modern 1970's fabric to facilitate orangery. Infill of modern 1970's window within east elevation.
Lea Hall Dunmow Road Hatfield Heath Bishops Stortford CM22 7BL
Proposed construction of single storey orangery extension to rear elevation. Partial removal of 1920's fabric and removal of modern 1970's fabric to facilitate orangery. Infill of modern 1970's window within east elevation.
Buttles Stagden Cross Road High Easter Chelmsford Essex CM3 1HS
Remodel of internal layout and construction of a double storey rear extension. Replacement of existing windows to new and compliant specifications and re-render to external finish
Passenger Terminal Stansted Airport
S62A/2023/0022 - Partial demolition of the existing Track Transit System and full demolition of 2 no. skylink walkways and the bus-gate building. Construction of a 3-bay extension to the existing passenger building, baggage handling building, plant enclosure and 3 no. skylink walkways and associated hardstanding
Upper Farm Bilden End Chrishall SG8 8RG
Demolition of extensions. Construction of single and two storey rear extensions. Creation of two internal openings on ground and first floor to connect to extension; creation of two new windows to rear facade at first floor; demolition of recently constructed garden shed.