Rutland Mills Tootal Street Wakefield
Non material amendment to approved planning application 17/02995/S7302 dated 27th January 2023 (which granted planning permission for the variation of condition 1 (approved plans) pursuant to approved application 17/02995/S7301 dated August 2020 to permit external changes to Building 6, external changes to Building 15 (including increasing its width) and changes to the landscaping/public realm within the site) to permit the replacement of the dormer windows on building 6 with inward opening double leafed windows with Juliet balconies.
Buzz Bingo Hall Park Road Castleford WF10 4RW
Variation of Conditions 2 (Plans), 10 (Boundary Treatments and Retaining Structures), 11 (Materials) and 24 (Landscaping) of Planning Permission 21/02064/S7301 dated 14/09/2022 which varied condition 18 (Drainage Scheme) of Planning Permission 21/02064/FUL in order to amend the entrance lobby and corporate colour scheme, position of fenestration, provision of retaining wall, relocation of parking spaces and delivery bay and adherence to Burger King's corporate specifications
Rutland Mills Tootal Street Wakefield WF1 5JN
Variation of condition 2 (approved plans) of approved application 17/02995/FUL dated 11 October 2019 [which granted full planning permission for the demolition of existing buildings and structures forming part of the listed mill complex; the repair, adaptation and alteration of existing buildings forming part of the listed mill complex and Caddies Wainwright building; erection of new external stair and lift cores; repairs and alterations to chimney to create new sculptural form; and construction of a new building. Use of the mill complex and new building for a flexible mix of the following uses: Retail shops (A1); Market stalls (A1); Restaurants and cafes (A3); Bars (A4); Food and drink market stalls (A5); Offices (B1); Craft workshops (B1); Studios (B1); Microbrewery (B2); Hotel (C1); Art gallery / display spaces (D1); Conference space (D1); Education and training (D1); Events space (D2) and health and fitness (D2). Associated external circulation and seating areas; creation of new public realm and landscaping; riverside pier structure; flood defences; cycle parking; access arrangements and highways works; rooftop plant; and other associated works including temporary uses during construction] to permit: changes to the replacement of windows across the complex; changes to rooflight design (buildings 7, 9, 10 and 11); omission of the new-build vertical circulation to building 7; change to the vertical circulation (internal) to building 9; change to the entrance space to building 11; elevational changes across the complex; and changes to the approved landscape and public realm