City Fields Phase 3B Land Adjacent To Nellie Spindler Drive And Neil Fox Way Wakefield
Non-material amendment to approved application 22/01209/FUL dated 11.07.2023 (Replan of City Fields Phase 3B (approved under 18/01802/FUL) including minor amendment to internal layout, construction of 29 additional dwellings taking overall total within this phase to 202 dwellings and substitution of house types) comprising a revision to the site layout plan to denote plot 53 as a grant funded affordable property with updates to the accommodation schedule table and drawings for the Shermont, Wilton, Whitton and Braxton housetypes to reflect the floorspace being provided across the development together with the variation of condition 2 (approved plans), 28 (obscure glazing and restrictors) and 29 (noise mitigation to insert the updated drawing references.
Land Off Neil Fox Way Phase 5A Neil Fox Way Wakefield WF1 4FY
Non-material amendment to approved application 21/02188/FUL dated 20.04.2022 (Replan of part of City Fields Phase 5A [approved under 18/02880/FUL] including minor amendments to internal layout and widening of road, construction of three additional dwellings, substitution of house types and revised drainage strategy) comprising house type substitutions on plots 53-63 to the Building Regulations Part L equivalent house type and revisions to previously approved boundary treatment details together with the variation of condition 1(approved plans).
Land South Of Field Lane South Elmsall Pontefract WF9 2SX
Non Material Amendment to Planning Permission ref. 19/02495/FUL dated 06/11/2020 'Construction of a warehouse and distribution centre' amendments comprise (a) reconfiguration/ re-location of: (i) car and cycle park and turning head, (ii) road spur, (iii) pedestrian and cycle pathways, (iv) staff amenity area, (v) conveyor bridge & stair towers, (vi) PV invertor plant, (vii) sprinkler tanks, (viii) access gate to northern yard, (ix) main site access pedestrian and vehicular access gates and associated filter lanes and (x) pump-house; (b) removal of: (i) pedestrian link bridge to west; (c) introduction of: (i) additional maintenance access doors, (ii) 4 sub-stations, (iii) northern-power-grid unit, (iv) 2 bailers to eastern elevation, (v) additional stair towers to southern and eastern elevations, (vi) vehicle protection barriers, (vii) amenity roof terrace and (viii) 5 rapid EV charging points; (d) extension of: (i) workshop block to eastern elevation, (ii) office and welfare block to north-western corner and (iii) secure perimeter fencing along the southern section of the access road; (e) substitution of: (i) aluminium feature frame with flat opus plank cladding system; (f) reduction in (i) HGV parking from 150 spaces to 131 spaces and (ii) accessible parking from 34 spaces to 29 spaces.