West Yorkshire Police Stephenson Way Wakefield WF2 0XY
Non-material amendment to approved application 20/00639/FUL dated 05.08.2020 (Extension to yard area and creation of additional car parking areas) [as amended by 20/00639/NMC01 which introduced a phasing plan] comprising minor alteration to construction details, repositioning of proposed fenceline to east site boundary and revised drainage infrastructure to enable the development to come forward on a phased basis together with the variation of conditions 2 (approved plans) and 10 (drainage) to insert the revised plan(s).
City Fields Phase 3 Wakefield
Non material amendment to approved application 18/01802/S7301 dated 16.12.2019 (Variation of condition 2 (approved plans) of application Reference Number: 18/01802/FUL dated 01/03/2019 (289 residential units (C3) phase 3 City Fields) to vary house types on plots 252, 253, 254, 262, 279, 280, 281 and 282; minor amendments to house types Ashbery, Repton, Mitford, Stevenson, Malory, Tolkien, Stretton and Yare; alteration to width of shared surface and alteration of surface to tarmac of footpath on western boundary within phase 3C) to permit a revised phasing scheme and carve out the road formerly part of phase 3A to form its own phase (3Bi), together with amendment to conditions 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 14, 16, 17, 18, 21, 22, 24, 25, 28, 31 and 32 to insert references to updated phased delivery of condition requirements and to insert the revised phasing plan and updated access details to phase 3Bi.
Beacon House Field Lane Upton Pontefract WF9 1NJ
Variation of Conditions 2 (Approved Plans) and 19 (Levels) and removal of conditions 11 (Structures) and 15 (Made Ground),condition 24 (Construction Phase Plan) of application reference no: 17/02165/FUL dated 26/02/2021 (Residential development comprising 22no. two and three bedroom affordable dwellings including associated works) in order to allow for alterations to the site entrance and to the orientation of visitor parking spaces; amend boundary treatments to plot frontages; revise proposed levels [and associated paths and steps] in the NE corner of the site and agree a revised remediation strategy.