3 Rhodes Way Watford WD24 4YW
Redevelopment of the Site to provide a new self-storage facility (Use Class B8) with associated car and cycle parking, landscaping and other works ancillary to the development.
Former Mothercare HQ 1 Cherry Tree Road Watford
Proposed alterations to the ground to third floor of the facade (replacement of windows and installation of insulation) partial demolition of the adjoining canteen/warehouse and entrance lobby, the creation of new facades, landscaping, sustainable drainage and other associated development.
3 Cherry Tree Road Watford Hertfordshire WD24 6RX
Demolition of existing dwelling with the erection of 9 x 4-bed dwellings together with car and cycle parking, private amenity space, refuse storage, landscaping and other associated development.
96 - 98 St Albans Road Watford Hertfordshire WD17 1RS
Erection of a two storey marketing suite in connection with the mixed use development at 94-98 and 114 St Albans Road, Watford, together with hard and soft landscaping and ancillary works.
1 - 5 Faraday Close And 1- 6 Greenhill Crescent Watford Hertfordshire
Redevelopment of the site, including demolition and erection of new commercial buildings, to provide a flexible mix of uses comprising: research and development (Class E), light industrial (Class E), general industrial (Class B2), storage and distribution (Class B8), ancillary offices (Class E), standalone cafe (Class E), parking, landscaping and associated works
26 And 28 Upton Road Watford WD18 0JP
Refurbishment of existing HMO (to include part demolition and rear extension,reduction from 27 to 25 rooms, new kitchens and plant room. External alterations (including removal of chimneys and rear fire escape and window amendments) and new residential development (Use Class C3) with associated amenity space, landscaping, disabled parking space, cycle parking, refuse storage and associated works.
Mothercare Uk Ltd 1 Cherry Tree Road Watford WD24 6SH
Alterations to the ground to third floor of the facade (including replacement of windows and installation of insulation) along with the partial demolition of the adjoining canteen/warehouse and entrance lobby, the associated creation of new facades, landscaping, sustainable drainage and other associated development.