Land West Of Rushden Lakes Ditchford Lane Rushden
Variation of conditions pursuant to 19/01092/FUL. Hybrid application comprising: A full application for the erection of retail units, restaurant units, office floorspace, physiotherapy/leisure floorspace, ancillary storage floorspace, (with associated site clearance, earthworks, site levelling and formation of banks) together with proposals for access, footpaths, parking and servicing space, hard and soft landscaping, drainage works, attenuation ponds and other associated works and an outline application for the erection of employment units with some matters reserved (layout, scale, appearance). Plus construction of a new link road between Ditchford Road and Rushden Lakes (with associated site clearance and earthworks) alongside junction works, footpaths, cycleways, lighting, hard and soft landscaping and associated works (Resubmission of 18/01197/FUL). Condition Number(s): Conditions 4 - approved plans, Condition 6 - reserved matters pursuant to Parameter plan and Design and Access Statement, Condition 10 - retailers square footage, Condition 11 - retailers square footage, Condition 12 - Use of unit 6A, Condition 14 - no amalgamation of units, Condition 17 - Flood Risk Assessment, Condition 25 - Drainage. Conditions(s) Removal: Please refer to accompanying Covering Letter and Planning Statement.
A509 Isham Bypass
Scoping Opinion for the proposed construction and operation of the A509 Isham Bypass
A509 Isham Bypass
Scoping Opinion for the proposed construction and operation of the A509 Isham Bypass
Crossroads Oasis Sywell Road Holcot Northamptonshire NN6 9SN
Cross-boundary application for demolition of greenhouses and change of use of land for use as depot for commercial open storage (Class B8) and servicing of construction plant and equipment (Class B2) and re-use of buildings as ancillary offices (Class Ei)/storage (Class B8), and other associated works.
H M Prison Millers Park Wellingborough Northamptonshire NN8 2NH
Extension to hours - the proposal for the revised construction hours are Monday - Friday, - 7.30 - 21.00 hrs, Saturday, 7.30 - 21.00 hrs, Sunday and bank holidays, 8.30 - 16.30 hrs to take effect from 22/02/2021 until 31/03/2021 (Sunday and bank holidays agreed amendment 9.30-16.30)
Land To The East Of Kettering Road Overstone Northamptonshire
Outline application for an urban extension consisting of circa 1600 dwellings; a new section of A43 dual carriageway road; up to 5.95ha of commercial land, including: a local centre (Use Classes A1/A3/A5/D1), assisted living/residential care home (Class C2), conversion of former agricultural buildings to a community hub (Classes D1/A3) and employment (Classes B1/B2/B8); a new 2-form entry primary school; public open space, including allotments and children's play space; structural landscape planting; and associated infrastructure including drainage features and access (part access unreserved for the roundabout, employment site and construction accesses into the site off the A43). AMENDED