Village Hall Thelnetham Road Hopton Suffolk IP22 2QY
Application to discharge conditions three (phased development) four (construction method statement) eight (highways deliveries management plan) nine (highways ditch beneath access) and partially discharge conditions five (ground levels) 22 (foul water strategy) and 23 (surface water drainage strategy) of DC/15/2298/FUL
Land Nw Of Haverhill Anne Sucklings Lane Little Wratting Suffolk
Reserved matters application - submission of details under outline planning permission SE/09/1283 - the means of access, appearance, landscaping, layout and scale for the construction of 98 dwellings, together with associated means of enclosure, car parking, vehicle and access arrangements, landscaping and open space for a phase of residential development known as Phase 6. The application includes the submission of details to enable the discharge of conditions B9, B16, B17, B20, B21, B24 of outline planning permission SE/09/1283
Land Rear Of The Lodge The Green Rougham Suffolk
Reserved matters application - a. submission of details under outline planning permission DC/21/1703/OUT - matters reserved by condition 2 (access, appearance, landscaping, layout and scale) for the development of two semi-detached dwellings and Application to discharge conditions 5 (biodiversity enhancement layout) and 6 (lighting design scheme for biodiversity) of DC/21/1703/OUT
Development Site Tayfen Road Bury St Edmunds IP33 1TA
Application to discharge conditions - 7 (Development in accordance with the FRA), 9 (Maintenance etc of flood areas), 10 (Flood evacuation routes), 11 (Surface Water Drainage Scheme), 13 (Foul water drainage scheme), 14 (Acoustic Design Statement), 16 (Site and floor levels), 17 (Tree and Ecology Plan), 19 (Soft landscpaing measures), 20 (Hard landscaping measures), 21 (External materials), 29 (Details of parking etc areas (dwellings)) of DC/15/0689/OUT
28-34 Risbygate Street Bury St Edmunds IP33 3AA
Application to discharge condition 2 (fire hydrant provision), condition 3 and 21 (construction method statement and construction deliveries management plan), condition 5 (surface water drainage scheme), condition 6 (written scheme of archaeological investigation), condition 8 (ground investigations), condition 9 (remediation strategy), condition 11 (arboricultural method statement), condition 12 (tree protection plan), condition 15 (details of proposed access), condition 18 (refuse/recycling bins), conditon 19 (means to prevent the discharge of surface water from the development onto the highway), condition 20 (details of internal accesses and footways), condition 22 (parking), condition 24ii (schedule of proposed materials), condition 40 (SUDS maintenance) of DC/20/0606/FUL
Parcel F, Marham Park Tut Hill Fornham All Saints Suffolk
Application to discharge conditions C5 (LEMP), C20 (loading and manoeuvring), C21 (highways layout), C22 (surface water discharge), C23 (estate roads), C29 (arb method statement), C30 (soft landscaping), C31 (ground levels), C34 (construction method statement), C35 (foul water strategy, C36 (drainage scheme), C37 (recycling) and C43 (right of way protection) of application DC/13/0932/HYB for development zone F
Parcel F Marham Park Tut Hill Fornham All Saints Suffolk
Application to discharge condition 32 (Fire hydrants) of DC/13/0932/HYB for development zone F
Land Ne Haverhill Wilsey Road Little Wratting CB9 7TB
Application to Discharge Conditions 12 (construction and environment management plan) and 25 (HGV movements) of application DC/15/2151/OUT. Partial discharge in relation to the construction of the northern development within phases 1a and 1b only. (as amended by plans and documents received on 22nd July 2020)
Land Adj Haverhill Business Park Bumpstead Road Haverhill Suffolk
Reserved Matters Application - Submission of details under Outline Planning Permission DC/15/2424/OUT - Matters Reserved by Condition 2 (appearance, landscaping, layout and scale) for the development of Units 1, 2 and 3 (Plots NE1 and NE2) for Class B1, B2 and B8 Application to Discharge Condition 6 (surface water drainage) , 7 (HGV traffic movements and deliveries management plan), 8 (loading manoeuvring parking), 10 (soft landscaping), 13 (landscape management plan), 17 (contamination)and 21 (SUDS) of DC/15/2424/OUT