Millingford Industrial Estate Bridge Street Golborne
Redevelopment of existing industrial estate and erection of new building for B2 General Industrial, B8 open storage and distribution and Class E (g)(i) administrative functions together with installation of wash bay, cycle store and shelter, associated car parking, hard and soft landscaping and boundary treatments including new fence and gates
Land Adjacent St Michaels Church Of England Primary School Leigh Road Atherton Manchester M46 0PA
Change of use of land to accommodate a natural area for school use - consisting of new landscaping, erection of 2m high mesh perimeter fencing, shelter and seating areas
1 Garton Drive Lowton Warrington WA3 2LH
To extend dwellinghouse - erection of boundary wall, fence and carport including landscape alterations to front
162 Manchester Road Astley Tyldesley Manchester M29 7FB
To convert existing buildings to create three dwellinghouses, together with associated demolition and alterations to external elevations, with associated parking, landscaping and boundary fencing
Site Of Pemberton Colliery Smithy Brook Road Wigan
Working Amendment application for previously approved application A/21/91969/RMMAJ to include amended house type at plot 190, amended fencing, EV charging bays, amended surfacing materials, and variation of the wording of condition 2 (landscaping) to include reference to phases of development.
Golborne High School Trinity Project Lowton Road Golborne WA3 3EL
External elevation alterations, internal layout changes and the installation of a canopy to an existing school building, together with a single storey extension to a reception area, installation of vent to school basement and external hard and soft landscaping works, including the erection of 2.4 metre high mesh fence and 2 metre high timber fence, following the removal of existing container
Aspull Clinic/Aspull Surgery Haigh Road Aspull WN2 1XH
Proposed new build 2 storey Aspull Health and Wellbeing Centre including pharmacy on the site of the current Aspull Clinic and Aspull Surgery following demolition of the existing surgery and clinic buildings. The proposal includes laying out of a new car park, landscaping, the installation of lighting columns and erection of boundary treatments including 2.4 metre high mesh fencing, knee rail fencing and metal balustrades.
Tremco Illbruck 5 Coupland Road Hindley Industrial Estate Hindley Green Wigan WN2 4HT
Construction of new sustainable drainage system comprising natural filtration beds and balancing pond together with associated landscaping and boundary fencing. Resubmission of previously approved A/19/88322/MAJOR