Windsor & Maidenhead Borough Council Planning Applications

Found 30 planning applications

22/01872/CONDIT | Discharge of Condition

Gardner House Harrow Lane Maidenhead

Details required by Condition 2 (Tiles); 7 (Construction Environmental Management Plan); 11(Access Stopped Up); 12 (Tree Protection); and 14 (Surface Water Drainage) of planning permission 20/02623/VAR for a variation (under Section 73) of condition 16 (approved plans) to substitute those plans approved under 19/00148/FULL for demolition of existing 33 x 1 bed sheltered housing and erection of 23 x 2 bed affordable homes.

Local Authority
Windsor & Maidenhead Borough Council
Type
Approval (Discharge) of conditions (Discharge of Condition)
Decision
Approved (Approve Discharge of Condition)
Application Received
12/07/2022
Application Validated
12/07/2022
Erection Demolition Variation Construction Trees
19/03261/VAR | Variation Under Reg 73

Blacknest Park Whitmore Lane Ascot SL5 0PX

Variation (under Section 73) of condition (20) to substitute those plans approved under (17/02643) for the construction of x1 detached dwelling, gatehouse, garage and associated works including removal of spoil from the site and the erection of a boundary fence and entrance gate with amended plans.

Local Authority
Windsor & Maidenhead Borough Council
Type
Other (Variation Under Reg 73)
Decision
(No Further Action)
Application Received
25/11/2019
Application Validated
25/11/2019
Erection Variation Construction Dwelling Garage Fence Boundary
23/01927/CONDIT | Discharge of Condition

Legoland Windsor Resort Winkfield Road Windsor SL4 4AY

Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.

Local Authority
Windsor & Maidenhead Borough Council
Type
Approval (Discharge) of conditions (Discharge of Condition)
Decision
Approved (Approve Discharge of Condition)
Application Received
07/08/2023
Application Validated
07/08/2023
Extension Alteration Erection Construction Agricultural Landscaping Discharge Accommodation
23/00835/FULL | Full

Ankerwycke Priory Staines Road Wraysbury Staines TW19 5AG

Erection of viewing deck and construction of footpath and boardwalk, new and relocation of fence and installation of signage.

Local Authority
Windsor & Maidenhead Borough Council
Type
Full planning consent (Full)
Decision
Approved (Application Permitted)
Application Received
05/04/2023
Application Validated
11/04/2023
Erection Construction Fence
22/02240/CONDIT | Discharge of Condition

Grove Park Industrial Estate Waltham Road White Waltham Maidenhead SL6 3LW

Details required by Condition 7 (Slab Levels), Condition 8 (Lighting), Condition 10 (CEMP), Condition 20 (Tree Protection), Condition 22 (Construction), Condition 24 (CEMP Construction) of Planning Permission 18/03348 for Outline application for access, layout and scale only to be considered at this stage with all other matters to be reserved for the erection of up to x79 dwellings and erection of a nursery building (D1) following demolition of a number of existing buildings.

Local Authority
Windsor & Maidenhead Borough Council
Type
Approval (Discharge) of conditions (Discharge of Condition)
Decision
Approved (Approve Discharge of Condition)
Application Received
16/08/2022
Application Validated
16/08/2022
Erection Demolition Construction Dwelling Trees
13/30026/SMI | Spheres of Mutual Interest

Danesfield House Hotel Henley Road Medmenham Marlow SL7 2EY

Demolition of existing spa and conference building, erection of new subterranean spa with 21 woodland suites and juice bar, new conference centre, alterations to listed building including new conservatory wedding suite with roof to existing service yard, construction of new underground service yard with re-structured parking and landscaped setting

Local Authority
Windsor & Maidenhead Borough Council
Type
Other (Spheres of Mutual Interest)
Decision
(No Further Action)
Application Received
31/10/2013
Application Validated
31/10/2013
Alteration Erection Demolition Construction Roof Conservatory
19/30012/SMI | Spheres of Mutual Interest

Tirra Lirra 20 Dorney Reach Road Dorney Reach Maidenhead SL6 0DX

Erection of single storey front and part single storey/part two storey side extensions. Alterations to roof. Rear balcony and additional rear dormer window. Construction of front boundary wall/gates.

Local Authority
Windsor & Maidenhead Borough Council
Type
Other (Spheres of Mutual Interest)
Decision
Approved (No Objection)
Application Received
15/05/2019
Application Validated
15/05/2019
Extension Alteration Erection Construction Roof Windows Dormer Boundary
22/30013/SMI | Spheres of Mutual Interest

Longcross North Chobham Lane Longcross Chertsey KT16 0EE

Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.

Local Authority
Windsor & Maidenhead Borough Council
Type
Other (Spheres of Mutual Interest)
Decision
(No Comment)
Application Received
10/05/2022
Application Validated
10/05/2022
Erection Demolition Variation Construction Roof Development Landscaping Office Fence
22/02238/CONDIT | Discharge of Condition

Legoland Windsor Resort Winkfield Road Windsor SL4 4AY

Details required by Condition 6 (plans/sections) (partial discharge), Condition 7 (Materials) (partial discharge), Condition 16 (Security/Access) (partial discharge) Condition 21 (surface water drainage scheme) of Planning Permission 17/01878 for Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.

Local Authority
Windsor & Maidenhead Borough Council
Type
Approval (Discharge) of conditions (Discharge of Condition)
Decision
Approved (Approve Discharge of Condition)
Application Received
16/08/2022
Application Validated
16/08/2022
Extension Alteration Erection Construction Agricultural Landscaping Discharge Accommodation
22/01595/LEG | Legal Agreement - Modification/Discharge

Legoland Windsor Resort Winkfield Road Windsor SL4 4AY

Discharge of planning obligation (Travel Plan - Clause 2.1-2.2) in regards to planning application 17/01878/OUT for hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.

Local Authority
Windsor & Maidenhead Borough Council
Type
Other (Legal Agreement - Modification/Discharge)
Decision
Approved (Application Permitted)
Application Received
09/06/2022
Application Validated
09/06/2022
Extension Alteration Erection Construction Agricultural Landscaping Discharge Accommodation