Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
70 High Street Maidenhead SL6 1PY
Variation (under Section 73A) of Condition 12 to substitute those plans approved under (22/01545/VAR) as approved under (21/01616/FULL) for (change of use and extension to the upper floors from ancillary retail use to form 8 apartments, alteration and extension of the ground floor retail unit with roof terrace over, alteration and extension of first and second floor, and construction of a block of 18 apartments with new pedestrian access) with amended plans.
70 High Street Maidenhead SL6 1PY
Details required by Condition 3 (Landscaping) of Planning Permission 22/01545 for Variation (under Section 73A) of Condition 4 (Slab Levels); Condition 6 (Refuse and Recycle Provision); Condition 7 (Cycle Parking) and Condition 12 (Approved Plans) to substitute those plans approved under 21/01616/FULL for the change of use and extension to the upper floors from ancillary retail use to form 8 apartments, alteration and extension of the ground floor retail unit with roof terrace over, alteration and extension of first and second floor, and construction of a block of 18 apartments with new pedestrian access with amended plans.
The Ark 20 And Land To The Rear of 20 Ray Street Maidenhead
Provision of new external access ramp for disabled access to the Public House with internal access modifications, single storey replacement and part two storey extension to the north/east elevations with x1 first floor east facing balcony and east facing beer garden, new pub bin store, removal of door on ground floor south/west elevations, single storey extension to south elevation with first floor balcony and second floor Juliet balcony above, raising of the eves, x2 dormers on west elevation and x2 dormers on east elevation, creation of x1 additional flat at first floor, x1 new flat on the second floor and alterations to fenestration, new car park for pub staff with vehicular access off Ray Park Lane, construction of a part two part three storey building comprising of two flats and car park at ground floor with bin and bicycle storage and maintaining existing vehicular access off Ray Park Lane for the flats, following demolition of existing elements on the north/east elevations and two outbuildings.
Tirra Lirra 20 Dorney Reach Road Dorney Reach Maidenhead SL6 0DX
Erection of single storey front and part single storey/part two storey side extensions. Alterations to roof. Rear balcony and additional rear dormer window. Construction of front boundary wall/gates.
Star House 20 Grenfell Road Maidenhead SL6 1EH
Details required by Conditions 2 (Hard landscaping), 3 (External lighting), 4 (Street lighting), 5 (External ramps and platform lift), 8 (Soft landscaping) and 9 (Cycle storage) of planning permission 22/02123/VAR for the Variation (under Section 73A) of conditions 5 (details of the steps and ramp), 10 (construction management plan) and 13 (approved plans) to comply with the approved construction management plan and for minor changes to the building elevations and layout and substitute those plans approved under 21/01419/FULL for extension, alterations and refurbishment of existing building (Use Class E).
The Ark 20 And Land To The Rear of 20 Ray Street Maidenhead
Provision of new external access ramp for beer keg storage into existing basement with internal access modifications, part single part two storey extension to the north/ east elevations with x1 first floor east facing balcony and east facing beer garden, new pub bin store, removal of door on ground floor south/west elevations, single storey extension to south elevation with first and second floor balconies above, raising of the eves, x1 dormer on west elevation and x1 dormer on east elevation, creation of x1 additional flat at first floor, x1 new flat on the second floor and alterations to fenestration, new car park for pub staff with vehicular access off Ray Park Lane, construction of a three storey building comprising of two flats and car park at ground floor with bin and bicycle storage and maintaining existing vehicular access off Ray Park Lane for the flats, following demolition of existing elements on the north/east elevations and two outbuildings.
47 Oaken Grove Maidenhead SL6 6HN
Construction of full height first floor extension to provide a replacement first floor, two storey side and part two, part single storey rear extension, raised patio and alterations to fenestration following the demolition of the existing garage.
Runneymede Hotel Windsor Road Egham TW20 0AG
External alterations and extensions to existing hotel building, construction of new ancillary buildings/structures, provision of new car parking, landscaping and other incidental works.
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 6 (plans/sections) (partial discharge), Condition 7 (Materials) (partial discharge), Condition 16 (Security/Access) (partial discharge) Condition 21 (surface water drainage scheme) of Planning Permission 17/01878 for Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.