Blacknest Park Whitmore Lane Ascot SL5 0PX
Variation (under Section 73) of condition (20) to substitute those plans approved under (17/02643) for the construction of x1 detached dwelling, gatehouse, garage and associated works including removal of spoil from the site and the erection of a boundary fence and entrance gate with amended plans.
Danesfield House Hotel Henley Road Medmenham Marlow SL7 2EY
Demolition of existing spa and conference building, erection of new subterranean spa with 21 woodland suites and juice bar, new conference centre, alterations to listed building including new conservatory wedding suite with roof to existing service yard, construction of new underground service yard with re-structured parking and landscaped setting
Tirra Lirra 20 Dorney Reach Road Dorney Reach Maidenhead SL6 0DX
Erection of single storey front and part single storey/part two storey side extensions. Alterations to roof. Rear balcony and additional rear dormer window. Construction of front boundary wall/gates.
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Discharge of planning obligation (Travel Plan - Clause 2.1-2.2) in regards to planning application 17/01878/OUT for hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Tirra Lirra 20 Dorney Reach Road Dorney Reach Maidenhead SL6 0DX
Variation of condition 8 (approved plans) of planning permission PL/19/3486/FA (Demolition of existing dwelling. Erection of detached dwelling. Construction of front boundary wall.) to allow changes to design.
Tirra Lirra 20 Dorney Reach Road Dorney Reach Maidenhead SL6 0DX
Variation of condition 8 (approved plans) of planning permission PL/19/3486/FA (Demolition of existing dwelling. Erection of detached dwelling. Construction of front boundary wall.) to allow changes to design.
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)