Gardner House Harrow Lane Maidenhead
Details required by Condition 2 (Tiles); 7 (Construction Environmental Management Plan); 11(Access Stopped Up); 12 (Tree Protection); and 14 (Surface Water Drainage) of planning permission 20/02623/VAR for a variation (under Section 73) of condition 16 (approved plans) to substitute those plans approved under 19/00148/FULL for demolition of existing 33 x 1 bed sheltered housing and erection of 23 x 2 bed affordable homes.
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Ankerwycke Priory Staines Road Wraysbury Staines TW19 5AG
Erection of viewing deck and construction of footpath and boardwalk, new and relocation of fence and installation of signage.
Grove Park Industrial Estate Waltham Road White Waltham Maidenhead SL6 3LW
Details required by Condition 7 (Slab Levels), Condition 8 (Lighting), Condition 10 (CEMP), Condition 20 (Tree Protection), Condition 22 (Construction), Condition 24 (CEMP Construction) of Planning Permission 18/03348 for Outline application for access, layout and scale only to be considered at this stage with all other matters to be reserved for the erection of up to x79 dwellings and erection of a nursery building (D1) following demolition of a number of existing buildings.
Tirra Lirra 20 Dorney Reach Road Dorney Reach Maidenhead SL6 0DX
Erection of single storey front and part single storey/part two storey side extensions. Alterations to roof. Rear balcony and additional rear dormer window. Construction of front boundary wall/gates.
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 6 (plans/sections) (partial discharge), Condition 7 (Materials) (partial discharge), Condition 16 (Security/Access) (partial discharge) Condition 21 (surface water drainage scheme) of Planning Permission 17/01878 for Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Discharge of planning obligation (Travel Plan - Clause 2.1-2.2) in regards to planning application 17/01878/OUT for hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Site Known As Nicholson Quarter Bound By High Street And Broadway Maidenhead
Hybrid planning application (part-outline, part-full) for comprehensive mixed-use redevelopment of the site including: (1) OUTLINE planning application (with all matters reserved) for four buildings that range in height, with the highest being 88.70m AOD and the lowest being 66.20m AOD, on the site for a comprehensive mixed-use redevelopment comprising: Residential Institutions (Class C2) - up to 29,400 m2 (GEA); Business Use (Class B1) - up to 29,700 m2 (GEA); Flexible Retail, financial and professional services, restaurants and cafes, drinking establishments, hot food takeaways, non-residential institutions and assembly and leisure (Class A1 / A2 / A3 / A4 / A5 / D1 / D2) - up to 4,400 m2 (GEA); Parking and plant space - up to 13,600 m2 (GEA); Formation of new pedestrian and vehicular access; Means of access and circulation and car parking within the site; and Provision of new public open space and landscaping. (2) FULL planning application for the demolition of all existing buildings on site, except Nicholsons House and Brock House, site preparation, construction of two residential buildings comprising 25 storeys, and part 15/part 10 storey and a landscaped podium (Class C3), construction of a 4 storey office building (Class B1), the provision of a new public open space, and landscaping and the erection of a multi-storey car park and flexible retail, financial and professional services, restaurant and cafes, drinking establishments, assembly and leisure uses (Class A1 / A2 / A3 / A4 / A5 / D1 / D2).
Site of Former Desborough Bowling Club York Road Maidenhead
Details required by Condition 8 (Construction Environmental Management Plan), Condition 9 (Drainage ) and Condition 16 (Archaelogy) (partial discharge) of Planning Permission 18/01777 for the Outline application for Access, Appearance, Layout and Scale only to be considered at this stage with landscaping matters to be reserved for the demolition of existing buildings on the site and erection of a building comprising 8, 7 and 6 storey blocks with two 4 storey linking elements to provide 149 apartments with associated access and servicing, landscaping, 169 car parking spaces and 149 cycle spaces.
Tirra Lirra 20 Dorney Reach Road Dorney Reach Maidenhead SL6 0DX
Variation of condition 8 (approved plans) of planning permission PL/19/3486/FA (Demolition of existing dwelling. Erection of detached dwelling. Construction of front boundary wall.) to allow changes to design.