St Cloud Gate St Cloud Way Maidenhead SL6 8XD
Details required by Condition 27 (Pedestrian Entrance Details) of planning permission 20/01463/FULL for the demolition of the existing office building, and the construction of a new grade A office building with associated cafe, communal roof terrace, car parking, new pedestrian access and landscaping.
St Cloud Gate St Cloud Way Maidenhead SL6 8XD
Details required by Condition 28 (Ground Levels) of planning permission 20/01463/FULL for the demolition of the existing office building, and the construction of a new grade A office building with associated cafe, communal roof terrace, car parking, new pedestrian access and landscaping.
St Cloud Gate St Cloud Way Maidenhead SL6 8XD
Details required by Condition 14 (Landscaping) of planning permission 20/01463/FULL for the demolition of the existing office building, and the construction of a new grade A office building with associated cafe, communal roof terrace, car parking, new pedestrian access and landscaping.
St Cloud Gate St Cloud Way Maidenhead SL6 8XD
Details required by Condition 7 (Contamination) for Planning Permission 20/01463 for the Demolition of the existing office building, and the construction of a new grade A office building with associated cafe, communal roof terrace, car parking, new pedestrian access and landscaping.
St Cloud Gate St Cloud Way Maidenhead SL6 8XD
Details required by Condition 21 (biodiversity enhancements) of planning permission 20/01463/FULL for the demolition of the existing office building, and the construction of a new grade A office building with associated cafe, communal roof terrace, car parking, new pedestrian access and landscaping.
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.
St Cloud Gate St Cloud Way Maidenhead SL6 8XD
Non material amendment to planning permission 20/01463/FULL to change the descritpion of proposed development to read as "Demolition of the existing office building, and the construction of a new grade A office building with associated cafe, communal roof terrace, cycle store, bin store, car parking, new pedestrian access, landscaping and associated plant."
Heatherwood Hospital London Road Ascot SL5 8AA
Details required by Condition 5 (partial discharge) (Lighting strategy) and Condition 6 (Foul Drainage Strategy) of planning permission 19/02186/VAR for a Variation (under Section 73A) of Condition 2 (Approved Plans) to substitute with amended plans and Condition 3 (Floorspace) approved under 16/03824/FULL for the change of use from hospital accommodation (Use Class D1) to offices with associated IT hub and staff restaurant (Use Class B1a) and GP Practice (Use Class D1) with associated parking, landscaping, replacement roof top plant, external staircase, temporary car park and demolition of existing walkway.
Windsor Dials Arthur Road Windsor SL4 1RS
Details required by condition 3 (hard and soft landscaping) 4 (cycle storage) 7 (flood risk assessment) of planning application 19/02416 for alterations to the existing roof structures to create an additional office floor, creation of new entrance lobbies and core areas and refurbishment of the elevations and public realm to buildings 1 and 2 Windsor Dials.
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)