Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.
49 Victoria Road And Shepherds Hut 17 And Including Land To Rear of 17 Eton Wick Road Eton Wick Windsor
Variation (under Section 73) of condition 11 (approved plans) to substitute those plans approved under 19/01548/FULL for the erection of 6no. dwellings including a raised walkway, change of use of former Shepherds Hut to cafe following demolition of 49 Victoria Road, and part demolition of Shepherds Hut. And, to vary the wording of Condition 6 (Section 278) to read 'The development shall not be occupied until a Section 278 (of the Highways Act 1980) Agreement has been secured with the Highways Authority for new access that can achieve pedestrian and visibility splays compliant with the Borough's current requirements as shown on Drawing: Visibility Splays [A19067C-101 Rev P1]. The development shall not be occupied until the new access as approved through the S278 Agreement has been carried out in full'.