Thatched Cottage Old Avenue West Byfleet Surrey KT14 6AD
Approval of details pursuant to conditions 05 (Details of service & drainage runs etc. and of specialist methods of construction within RPAs), 06 (Sustainable drainage system, SuDS) and 09 (Measures for the enhancement of biodiversity) of planning permission ref: PLAN/2021/1065 dated 01.12.2021 (Erection of two storey side and single storey side and rear extensions, replacement linked garage following demolition of existing garage, associated external works) and planning permission ref: PLAN/2022/0741 dated 26.10.2022 (Erection of two storey side and rear extensions, replacement linked garage following demolition of existing garage, associated landscaping works).
McLaren Technology Centre Chertsey Road Woking Surrey GU21 4YH
Section 73 application to remove Condition 3 (personal permission) of planning permission PLAN/2018/0114 (Section 73 application to vary Condition 4 (approved plans), to revise the parking configuration and phase implementation, of Planning Permission PLAN/2014/1297 for the development of an applied technology centre of 57,000sq m (G.E.A.) as an extension to the McLaren Production Centre, to include an aerodynamic research facility, workshops, research and development space, offices, meeting rooms, teaching and training space, vehicle preparation and assembly spaces, together with terraced car parking and two car park decks, cycle parking, a replacement helipad, and service areas. Associated earthworks and re-contouring of the open parkland, hard and soft landscape and infrastructure works, including an electrical substation and foul water pumping station and the temporary diversion of a public right of way during the construction of the development.)
McLaren Technology Centre Chertsey Road Woking Surrey GU21 4YH
Non-material amendment to PLAN/2018/0114 (Section 73 application to vary Condition 4 (approved plans), to revise the parking configuration and phase implementation, of Planning Permission PLAN/2014/1297 for the development of an applied technology centre of 57,000sq m (G.E.A.) as an extension to the McLaren Production Centre, to include an aerodynamic research facility, workshops, research and development space, offices, meeting rooms, teaching and training space, vehicle preparation and assembly spaces, together with terraced car parking and two car park decks, cycle parking, a replacement helipad, and service areas. Associated earthworks and re-contouring of the open parkland, hard and soft landscape and infrastructure works, including an electrical substation and foul water pumping station and the temporary diversion of a public right of way during the construction of the development.) to extend the time period for the commencement of development.