Elmbridge Borough Council Gloucester Square Woking Surrey
Formal consultation for the full and partial demolition of existing buildings within the Brooklands College campus, development of existing education facilities including external refurbishment and alterations of retained buildings, new and reconfigured entrances and the construction of a new three storey College building, and provision of a new sports hall and linked entrance building. Change of use of Brooklands House and the existing College Gatehouse to residential use and external works to both buildings, and the provision of residential units including provision of affordable housing, an extensive landscaping scheme including the provision of a SANG, car and cycle parking, new substations and plant, new boundary treatments and other associated works.
McLaren Technology Centre Chertsey Road Woking Surrey GU21 4YH
Section 73 application to remove Condition 3 (personal permission) of planning permission PLAN/2018/0114 (Section 73 application to vary Condition 4 (approved plans), to revise the parking configuration and phase implementation, of Planning Permission PLAN/2014/1297 for the development of an applied technology centre of 57,000sq m (G.E.A.) as an extension to the McLaren Production Centre, to include an aerodynamic research facility, workshops, research and development space, offices, meeting rooms, teaching and training space, vehicle preparation and assembly spaces, together with terraced car parking and two car park decks, cycle parking, a replacement helipad, and service areas. Associated earthworks and re-contouring of the open parkland, hard and soft landscape and infrastructure works, including an electrical substation and foul water pumping station and the temporary diversion of a public right of way during the construction of the development.)
McLaren Technology Centre Chertsey Road Woking Surrey GU21 4YH
Non-material amendment to PLAN/2018/0114 (Section 73 application to vary Condition 4 (approved plans), to revise the parking configuration and phase implementation, of Planning Permission PLAN/2014/1297 for the development of an applied technology centre of 57,000sq m (G.E.A.) as an extension to the McLaren Production Centre, to include an aerodynamic research facility, workshops, research and development space, offices, meeting rooms, teaching and training space, vehicle preparation and assembly spaces, together with terraced car parking and two car park decks, cycle parking, a replacement helipad, and service areas. Associated earthworks and re-contouring of the open parkland, hard and soft landscape and infrastructure works, including an electrical substation and foul water pumping station and the temporary diversion of a public right of way during the construction of the development.) to extend the time period for the commencement of development.