Land at Junction of Sawpit Road and School Road Hurst Berkshire
Application for the discharge of conditions & variation of a condition following grant of planning permission. (Appeal Reference: APP/X0360/W/21/3280255 , Planning Application Reference 211532) for the proposed erection of 2 no. four bedroom detached dwellings and 2 no. three bedroom semi-detached dwellings, with associated site access, car parking, home offices and landscape. Variation of condition 2 (approved drawings) by substituting the approved drawings with drawing numbers P22-14-100, P22-14-S-101 B, P22 -14-S-110, P22-14-S-120, P22-14-S-130 with revisions that incorporate design alterations together with the updated tree survey and tree protection plan. Details to discharge the following conditions: Condition 3 (materials), Condition 4 (boundary treatment), Condition 6 (hard & soft landscaping), Condition 7 (Landscaping � LEMP), Condition 9 (cycle storage), Condition 13 (surface water drainage) Condition 16 (refuse strategy), Condition 18 (CEMP).
Talavera The Devils Highway Crowthorne Wokingham RG45 6BJ
Application to vary condition 2 of planning consent 210588 for the proposed erection of 1no. five bedroom dwelling, the erection of a two storey detached garage including office on the first floor, 1no. outbuilding to the rear of the property, a swimming pool plus front entrance gates, following demolition of existing dwelling. Condition 2 refers to approved details and the variation is to allow alterations to the garage to include 2no. dormers, addition of roof lights and changes to fenestration, plus alterations to roof lights and dormers on the main dwelling (part retrospective).
GTO House Floral Mile Bath Road Hare Hatch RG10 9ES
Application to vary condition 3 of planning consent 193047 (as varied by application 210342) for the proposed erection of a workshop including associated office accommodation and storage following demolition of existing outbuildings. Condition 3 refers to the approved documents and the variation is to allow minor alterations including the addition of a basement, a glazed link from the new workshop to the main building, changes to fenestration and internal modifications.
Gto House Floral Mile Bath Road Hare Hatch RG10 9ES
Application to vary condition 3 of planning consent 193047 for the Full application for the proposed erection of a workshop including associated office accommodation and storage following demolition of existing outbuildings. Condition 3 refers to approved plans and the variation is to allow minor alterations to improve on the overall design and functionality of the new building
Site Known As Nicholson Quarter Bound By High Street And Broadway Maidenhead Maidenhead Unparished/St Marys
Consultation from Royal Borough of Windsor & Maidenhead for the following proposal: Hybrid planning application (part-outline, part- full) for comprehensive mixed-use redevelopment of the site including: (1) OUTLINE planning application (with all matters reserved) for the demolition of existing buildings and erection of four buildings that range in height, with the highest being 88.70m AOD and the lowest being 66.2m AOD), comprising: Extra Care - up to 29,700 sqm (GEA); Business Use - up to 30,400 sqm (GEA); Flexible retail, financial and professional services, restaurants and cafes, drinking establishments, hot food takeaways, non-residential institutions and assembly and leisure - up to 4,400 sqm (GEA); Parking and plant space - up to 13,300 sqm (GEA); Formation of new pedestrian and vehicular access; Means of access and circulation and car parking within the Site; and Provision of new public open space, landscaping and associated works. (2) FULL planning application for the demolition of all existing buildings on site, except Nicholsons House, Brock House and 69 High Street (with alteration to the lower floors of Nicholsons House and partial demolition at 53-55 High Street), site preparation, erection of two residential buildings comprising 25 storeys, and part 15/part 10 storey (plus basement) and a landscaped podium, construction of a 4-storey part office building, the provision of a new public open space, and landscaping and the erection of a 12-storey multi-storey car park (plus basement) and flexible retail, financial and professional services, restaurant and cafes, drinking establishments, assembly and leisure, and heritage and community centre uses and associated works.