Central 7 The Campus Caspian Close Stanford Le Hope Essex SS17 9FN
London Gateway Logistics Park Local Development Order (LGLPLDO) Prior Notification of Development: Erection of two warehouse units (1no. Class B8 use and 1no. Class B2/B8 use) and ancillary office accommodation, plot parking, loading, unloading and turning areas, site access and circulation roads and footpaths, plant room, service infrastructure, boundary treatments, lighting, drainage, land-raising and landscaping. Construction of a single carriageway secondary infrastructure corridor, compr...
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of car parking spaces pursuant to condition 6 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of sound limiting insulation pursuant to condition 8 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of hard and soft landscaping pursuant to condition 5 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of biodiversity (green and brown) roofs pursuant to condition 16 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of cycle storage spaces pursuant to condition 18 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
Land Ex Site Of Brookside Garage 347 Wellingborough Road Finedon
Approval of details reserved by conditions 7 (details of the finished floor levels and ground levels of the proposed buildings on site in relation to the adjoining land and highway and any other changes proposed in the levels on the site (including sections)), 9 (a detailed scheme for the location, design and construction of acoustic noise barriers), 12 (a scheme and timetable detailing the provision of fire hydrants, sprinkler systems and their associated infrastructure), 13 (a scheme for the provision of a minimum of 10% EV charging points to be installed on site), 15 (details of all hard surfacing materials to be used in the construction of the development), 18 (full details of the secure covered cycle parking and bin/recycling storage enclosures to be provided on site in accordance with the locations shown on the hereby approved site layout plan) and 20 (details of screen walls/fences and boundary treatments) of planning permission reference NW/22/00280/FUL
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of charging points for electric vehicles pursuant to condition 7 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
The Barracks Block 17 To 25 The Keep Kingston Upon Thames KT2 5AU
Variation of Condition Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 1 (Approved Plans), Condition 2 (Expiry Date), Condition 3 (Samples of Replacement Bricks), Condition 4 (Material and Method of Construction), Condition 5 (Damage), Condition 6 (Conservation Management Plan) and Condition 7 (Details of Wall A) of planning permission 21/03618/LBC (Demolition and rebuilding of parts of the East & West boundary walls to include repointing of existing brick work and vegetation growth removal from wall. New foundation to be laid and anchors supports) to satisfy the conditions of planning approval.
168A Du Cane Road London W12 0TX
Submission of details of detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of external hard surfacing, paving, ramp and railings pursuant to condition 3; Construction Logistics Plan pursuant to condition 4; detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of a typical bay (including details of panelling, entrances, canopies and brise soleil) pursuant to condition 6; Details of external materials to be used in the development (including details of panelling, glazing, framing, canopies and brise soleil, external access ramp and roofing material) pursuant to condition 7; Ventilation Strategy Report pursuant to condition 13; final Sustainable Drainage System pursuant to condition 21; details of temporary alterations to the brick boundary wall and front boundary railings (including method statement) pursuant to Condition 23 of planning permission ref: 2021/02282/FUL granted 14th December 2021.