Sizewell C And Associated Development Sites Sizewell Power Station Road Sizewell Leiston Suffolk
Discharge of Requirement 2 (Code of Construction Practice - Site Waste Management Plan) of the Sizewell C Development Consent Order
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
Discharge of Requirement 2 (Code of Construction Practice - Site Wide Material Management Plan) of the Sizewell C Development Consent Order.
Land To The East Of Linacre Road Holme Hall Chesterfield Derbyshire
Discharge of conditions: 3 (Highway improvement works), 4 (Development program), 6 (Highway Construction Management Statement/Plan), 7 (Vehicular access junctions), 8 (Construction details of the estate streets and footways), 11 (Travel plan), 12 (Junction visibility sightlines), 17 (Employment and Training Scheme), 19 (Implementation of coal mining remediation work), 21 (Construction Environmental Management Plan), 22 (Scheme for the investigation and recording of contamination), 25 (Ecological Enhancement Plan), 31 (Tree protection plan and arboricultural method statement), 36 (Proposed street scene), 37 (Contour and attenuation pond details), 38 (Detailed design and associated management and maintenance plan of the surface water for the site), 39 (Assessment to demonstrate that the proposed destination for surface water accords with the drainage hierarchy) and 40 (Additional surface water run-off during construction phase), 41 (Associated management and maintenance plan in line with CIRIA SuDS Manual C753) and 46 (Carbon release reduction scheme) of application CHE/21/00707/FUL- Erection of 301 dwellings including the provision of public open space, landscaping and associated infrastructure and works
Meridian Water Willoughby Lane And Meridian Way London N18
Details pursuant to ref: 16/01197/RE3 for Conditions 4 (Phasing Plan), 10 (Remediation) (PARTIAL DISCHARGE), 11 (Remediation Verification Report) (PARTIAL DISCHARGE), 14 (Public Realm Strategy), 15 (Construction Environmental Management Plan Site Prep), 17 (Construction Environmental Management Plan), 18 (Construction Environmental Management Plan per Phase), 19 (Construction Logistics Plan), 29 (Green Procurement Plan), 30 (Implementation Plan and Verification Methods) (PARTIAL DISCHARGE), 35 (Surface Water and Drainage Management Plan), 42 (Drainage Strategy), 43 (Sustainable Drainage Details), 46 (Water Supply Infrastructure Impact Study), 47 (Archaeology), 59 (Strategy for Clearance of Slow Worms), 60 (Bat and Badger Checks), 61 (Hedge and Shrub Clearance), 62 (Eradication Strategy for Invasive Species), 71 (Cycle Parking), 74 (Highway and Footway Details), 82 (Construction Waste Management Plan), 83 (Waste Management Plan) and 86 (Wind Assessment) for the Main Site and discharge of planning Conditions 125 (Construction Management Plan), 126 (Construction Logistics Plan), 128 (Green Procurement Plan), 129 (Drainage Details), 130 (Sustainable Drainage Details), 134 (Landscaping Details), 136 (Strategy for Clearance of Slow Worms), 137 (Bat/ Badger Checks), 138 (Hedge and Shrub Clearance), 139 (Eradication Strategy for Invasive Species), 140 (Cycle Parking), 141 (Highway and Footway Details), 142 (Station Access Road Management Plan), 143 (Construction Waste Management Plan) and 144 (CCTV Provision) for the Station Public Realm Site only in relation to the Outline Planning Permission ref: 16/01197/RE3 for the Phase 1 Meridian Water development.
Sizewell C And Associated Development Sites Suffolk
Discharge of Requirement 2 (Code of Construction Practice -Dust Management Plan for site establishment early access road, Soil Management Plan for site establishment early access road) of Sizewell C Development Consent Order
Brent Cross Cricklewood Regeneration Area
Submission of details pursuant to the discharge of Conditions 12.1(b) (Detailed Construction Traffic Management Plan) covering above ground works in relation to the construction site comprising Plot 14 Reserved Matters Approval (LPA ref: 20/5690/RMA amended by 23/1877/NMA) Plot development only (as shown on Annex 2 Plot 14 Location relevant works area plan of the Cover letter), falling within Phase 2 (South) (Plots) of Planning Permission F/04687/13 dated 23/07/2014 for the Comprehensive redevelopment of Brent Cross Cricklewood.
Brent Cross Cricklewood Regeneration Area
Submission of details pursuant to the discharge of Conditions 28.2 (Site Waste Management Plan) covering above ground works in relation to the construction site comprising Plot 14 Reserved Matters Approval (LPA ref: 20/5690/RMA amended by 23/1877/NMA) Plot development only (as shown on Annex 2 Plot 14 Location relevant works area plan of the Cover letter), falling within Phase 2 (South) (Plots) of Planning Permission F/04687/13 dated 23/07/2014 for the Comprehensive redevelopment of Brent Cross Cricklewood.
Brent Cross Cricklewood Regeneration Area
Submission of details pursuant to the discharge of Conditions 12.2 (Construction Workers Travel Plan) covering above ground works in relation to the construction site comprising Plot 14 Reserved Matters Approval (LPA ref: 20/5690/RMA amended by 23/1877/NMA) Plot development only (as shown on Annex 2 Plot 14 Location relevant works area plan of the Cover letter), falling within Phase 2 (South) (Plots) of Planning Permission F/04687/13 dated 23/07/2014 for the Comprehensive redevelopment of Brent Cross Cricklewood.
Land To The North Of Norman Cross London Road Peterborough
Discharge of condition C23 (Site Specific Construction Management Plan) and C38 (Development Framework Plan) of planning permission reference 09/01368/OUT
1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition No13 of DC/21/5052/VOC - Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - 2: Amendments required to the approved scheme to reflect market changes and to make the scheme viable as an Employment Hub following market testing. 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the building. This to provide a contractors car parking area for the duration of the contract and avoid damage to the final finishes by such use during the construction project. Also, to allow time for co ordination with the proposed larger car parking provision within the site of the 10 spaces related to this development. In addition the 10 spaces are to be provided for the use of the users of the Employment Hub and the users will not be using this until they have occupied the premises so there is no advantage in having the final car park earlier. 2: Condition to be changed to replace list of previously approved drawings with amended drawings as included within this application to reflect amendments to the proposed scheme 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the b - Sustainable Urban Drainage System