London Brentwood Commercial Park Tilbury Road West Horndon Essex CM13 3LR
Approval of reserved matters (Access, Appearance, Landscaping, Layout and Scale) following Outline approval 19/00315/OUT (Outline planning application (with all matters reserved) for the redevelopment of the site comprising demolition of all buildings; construction of new buildings providing 35,000 sqm of Class B1b, B1c, B2 and B8 floor space and 250 sqm of Class A3 floor space, together with associated vehicle parking, loading, cycle parking and infrastructure) for the development of one Class B8 building (storage and distribution, including ancillary office provision) and one Class B2/B8 building (general industrial and storage distribution, including ancillary office provision), with associated access, loading yards, vehicle and cycle parking, servicing landscaping, and infrastructure).
The Hub Paradise Hemel Hempstead Hertfordshire
Details as required by condition 6 (Construction managment plan) attached to planning permission 21/04352/MFA (Demolition of existing light industrial building. Construction of mixed use development comprising 2 storey commercial building, with foodbank, bike workshop, office space and cafe area. Seven storey residential building (6 storey from main entrance plus lower ground floor to access ancillary spaces and parking) comprising 56 residential units, mix of 1 and 2 bedrooms, bin store, cycle store and parking. Associated parking spaces, scooter store and landscape.)
The Hub Paradise Hemel Hempstead Hertfordshire
Details required by Condition 13 (Tree protection plan) attached to Planning permisson 21/04352/MFA - Demolition of existing light industrial building. Construction of mixed use development comprising 2 storey commercial building, with foodbank, bike workshop, office space and cafe area. Seven storey residential building (6 storey from main entrance plus lower ground floor to access ancillary spaces and parking) comprising 56 residential units, mix of 1 and 2 bedrooms, bin store, cycle store and parking. Associated parking spaces, scooter store and landscape.
Malthouse Lane Business Centre Malthouse Lane Commerce Park Frome Somerset
Industrial development of 61 business units arranged in 9 blocks (falling in a flexible use of classes E(g)(i) (Formerly B1a)/ B8) to be constructed in two phases on area E2 and a single industrial building comprising 2 units (falling in a flexible use of classes E(g)(i)/E(g)(iii) (formerly B1a/B1c)/B8) on area E1, as permitted by Part 3 Class V of General Permitted Development Order (2015). (Additional/ revised construction drainage information received 7/7/22).
Brentwood Borough Council Chelmsford Essex CM15 8AY
Land South Of A127 East Of M25 Junction 29 Codham Hall Codham Hall Lane Great Warley Essex - Regulation 25 Submission: Brentwood Borough Council gives notice that further information has been submitted in support of the hybrid planning application with reference 22/00402/FUL, such further information seeking to remove the outline element of the application relating to the M25 to B186 link road (Phase 2) and making alteration to the application site boundary (to remove the outline element and land adjacent to Jax Folly). The following is the revised description of development for the application. Full planning application seeking detailed planning permission for demolition of existing buildings and structures; ground works to enable creation of development plots; highways works including construction of new A127 overbridge, access to B186, site roads and construction of M25 J29 to B186 link road (phase 1), erection of buildings for Class B8 (Storage and Distribution) and/or Class B2 (General Industrial) use within ancillary office space (within Class E); landscaping, infrastructure and enabling works including diversion of public rights of way. The further information relates to the Environmental Statement, including a Statement of Conformity Letter considering the implications for the changes to the red line boundary of the proposed development for the following topics: Socio-economics, Waste and Resources, Traffic and Transport, Air Quality, Noise and Vibration, Ground Conditions, Water Resources and Flood Risk, Ecology, Climate Change and Greenhouse Gas Emissions, Landscape and Visual Impact Assessments and Built Heritage.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,517sqm GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Land Rear Of 148 Station Road Burnham-On-Crouch Essex
Compliance with conditions notification 20/00375/FUL (Proposed change of use from Class B1 and B2 to Class C3, demolition of existing dilapidated industrial building and erection of 4 new residential dwelling houses, ancillary development and landscaping) Condition 3 - External facing materials, 6 - Investigation and risk assessment, 7 - Remediation Scheme and 11 - Construction Method Statement (CMS)
Land North Of Pride Parkway Pride Parkway Sleaford NG34 8GL
Application to discharge condition 5 - (estate road phasing and completion) and condition 9 - (drainage design for plot 1 & 3) and condition 23 - (public transport infrastructure) of planning permission 20/1475/FUL -Hybrid planning application for the construction of an employment park comprising of up to 35,851 sq.m (GIA) of general industrial and warehouse and distribution floorspace (Use Class B2 and B8 with ancillary Use Class E(g) plus 1,394 sq.m (GIA) of trade showroom floorspace (Use Class E(a)/(c) incorporating the construction of site-wide infrastructure works comprising access, drainage, earthworks and strategic landscaping (full application) and on-plot development of 37,245 sq.m (GIA) of floorspace (outline with all matters reserved)
Aquascutum Of London Building L 17 Princewood Road Earlstrees Industrial Estate Corby NN17 4ET
Condition 20 - CEMP:Biodiversity (Construction Environmental Management Plan: Biodiversity) Prior to the commencement of any development (or phase, as applicable) (including for the avoidance of doubt, demolition, groundworks and vegetation clearance), a Construction Environmental Management Plan (CEMP: Biodiversity) shall be submitted to and approved in writing by the Local Planning Authority Condition 21 - BMP (Biodiversity Monitoring Strategy) Prior to the commencement of any development (or phase, as applicable) (including for the avoidance of doubt, demolition, groundworks and vegetation clearance), a Biodiversity Monitoring Strategy (BMS) shall be submitted to and approved in writing by the Local Planning Authority Submitted Documents -Phase 2_Earlstrees Industrial Estate_CEMP_v1.0 -Phase 2_Earlstrees Industrial Estate_BMS_v1.0
Land South Of A127 East Of M25 Junction 29 Codham Hall Codham Hall Lane Great Warley Essex
Regulation 25 Submission: Brentwood Borough Council gives notice that further information has been submitted in support of the hybrid planning application with reference 22/00402/FUL, such further information seeking to remove the outline element of the application relating to the M25 to B186 link road (Phase 2) and making alteration to the application site boundary (to remove the outline element and land adjacent to Jax Folly). The following is the revised description of development for the application. Full planning application seeking detailed planning permission for demolition of existing buildings and structures; ground works to enable creation of development plots; highways works including construction of new A127 overbridge, access to B186, site roads and construction of M25 J29 to B186 link road (phase 1), erection of buildings for Class B8 (Storage and Distribution) and/or Class B2 (General Industrial) use within ancillary office space (within Class E); landscaping, infrastructure and enabling works including diversion of public rights of way. The further information relates to the Environmental Statement, including a Statement of Conformity Letter considering the implications for the changes to the red line boundary of the proposed development for the following topics: Socio-economics, Waste and Resources, Traffic and Transport, Air Quality, Noise and Vibration, Ground Conditions, Water Resources and Flood Risk, Ecology, Climate Change and Greenhouse Gas Emissions, Landscape and Visual Impact Assessments and Built Heritage.