Land South Of Gorse Lane Silk Willoughby Sleaford Lincolnshire
Application to discharge condition 3 (Pre-construction Condition Survey), 4 (Construction Management Plan and Method Statement), 5 (Landscape and Ecological Management Plan and Enhancement Plan), 6 ( Tree and Hedgerow Planting) and 10 (Work Written Specification) attached to application 19/0060/FUL - Erection of Solar PV park (circa 20MW electricity generating capacity) including inverters, substations, office building, store, perimeter fencing, access tracks, temporary construction compound and associated development.
Arrowbuild And Civil Engineering Limited Whitehouse Innovation Park New Road Billingham TS23 1LE
Information to discharge condition no4 (Construction Management Plan) and no6 (Surface Water Management) of planning approval 21/2553/FUL - Erection of 1no warehouse building and a two storey office building with ancillary trade counter. Installation of hardstanding and creations of parking areas. Creation of a new vehicle access, erection of new fence and associated external alterations
Land East Of Grove Lane Doveridge Derbyshire
Discharge of condition 7 i) of planning appeal APP/P1045/C/20/3255861 - Change of use of land to use as a residential caravan site including the stationing of 13 caravans of which no more than 5 shall be static caravans, laying of hardstanding, erection of 4 no. amenity buildings and, construction of boundary fencing
Installation Of High Voltage Direct Current (DC) Cables For The Viking Link Interconnector Project Between Proposed Landfall At Boygrift In East Lindsey To A Proposed Converter Station At North Ing Drove In South Holland
Application to discharge condition 14 (Archaeological Mitigation) attached to application 17/1200/FUL - Works to facilitate the Viking Link electrical interconnector with an approximate capacity of 1400 megawatts (MW) extending from Revsing, Jutland, (Denmark) to Bicker Fen, Lincolnshire (UK) comprising: - Installation of two (2) subsea high voltage direct current (DC) cables between Mean Low Water Springs (MLWS) and landfall at Boygrift in East Lindsey; - Installation of two (2) onshore DC cables between the landfall at Boygrift and the converter station at North Ing Drove in South Holland; - Construction of associated Temporary Construction Compounds (TCC) and Temporary Works Areas (TWA) and temporary vehicle access arrangements required for DC and AC cable installation; - Erection of converter station buildings together with the formation of internal roads, permanent access road from the A52, erection of security fencing, formation of landscaping with associated temporary construction compounds; - Installation of up to six (6) onshore high voltage alternating current (AC) cables between the converter station at North Ing Drove and the existing Bicker Fen 400 kilovolt (400kV) Substation owned and operated by National Grid Electricity Transmission Plc (NGET); - Installation of link pillars along the AC cable route for inspection and maintenance purposes, these will be contained within fenced areas; - Installation of two substation bays at Bicker Fen Substation to allow Viking Link to be connected to the National Grid electricity transmission system; - Installation of all associated drainage mitigation works; and - Installation of fibre-optic cable(s) with the high voltage AC and DC cables (A bay consists of switching equipment including circuit breakers, disconnector and measuring equipment. NGET will be providing Viking Link the space available to connect to Bicker Fen).
Installation Of High Voltage Direct Current (DC) Cables For The Viking Link Interconnector Project Between Proposed Landfall At Boygrift In East Lindsey To A Proposed Converter Station At North Ing Drove In South Holland;
Application to discharge condition 5 (Landscape Restoration) attached to planning permission 17/1200/FUL - Works to facilitate the Viking Link electrical interconnector with an approximate capacity of 1400 megawatts (MW) extending from Revsing, Jutland, (Denmark) to Bicker Fen, Lincolnshire (UK) comprising: - Installation of two (2) subsea high voltage direct current (DC) cables between Mean Low Water Springs (MLWS) and landfall at Boygrift in East Lindsey; - Installation of two (2) onshore DC cables between the landfall at Boygrift and the converter station at North Ing Drove in South Holland; - Construction of associated Temporary Construction Compounds (TCC) and Temporary Works Areas (TWA) and temporary vehicle access arrangements required for DC and AC cable installation; - Erection of converter station buildings together with the formation of internal roads, permanent access road from the A52, erection of security fencing, formation of landscaping with associated temporary construction compounds; - Installation of up to six (6) onshore high voltage alternating current (AC) cables between the converter station at North Ing Drove and the existing Bicker Fen 400 kilovolt (400kV) Substation owned and operated by National Grid Electricity Transmission Plc (NGET); - Installation of link pillars along the AC cable route for inspection and maintenance purposes, these will be contained within fenced areas; - Installation of two substation bays at Bicker Fen Substation to allow Viking Link to be connected to the National Grid electricity transmission system; - Installation of all associated drainage mitigation works; and - Installation of fibre-optic cable(s) with the high voltage AC and DC cables (A bay consists of switching equipment including circuit breakers, disconnector and measuring equipment. NGET will be providing Viking Link the space available to connect to Bicker Fen).
The Arriva Bus Company Depot Dunstable Road Luton LU4 8DG
Construction of a new yard, including additional 4.5m acoustic fencing and 12m high external lighting, and alterations to existing yard following demolition of Former Social Club and erection of lean-to extension at the rear of the workshop building. Discharge of Conditions 4 (Noise Impact Assessment) and 5 (Lighting Design and Product Information) of plannng permission 20/00310/FUL dated 6th July 2020.
Primrose Hill Farm Runshaw Lane Euxton Chorley PR7 6AX
Application to discharge condition no.3 (design, materials and construction method) of planning permission ref: 17/00129/FULHH (Erection of a wooden acoustic fence leaving the already existing motorway fence)
168-170 Lockhurst Lane Coventry CV6 5NY Coventry
Discharge of Conditions 7 (Construction Management Plan) imposed on FUL/2020/0885 for Demolition of existing building, canopy link and Jet wash bay and Erection of new sales building constructed with external compound/refuse area enclosed by 2m fence, existing car wash converted to jet wash bay and associated alterations granted on 16/06/2020.
15A Normanton Road South Croydon CR2 7AE
Discharge of conditions 9 (Electric Vehicle Charging Points), 11 (Construction Logistics Plan), 12 (ecology), 13 (CEMP (Biodiversity)), 14 (Biodiversity Method Statement), 15 (badgers), 16 (wildlife fencing), 17 (birds), 18 (lighting design for biodiversity), 19 (Biodiversity Compensation and Enhancement Strategy), 22 (surface water drainage) and 23 (flood resistance and resilience measures) attached to planning permission 19/03438/FUL for the erection of 3 houses with associated parking and landscaping
Land Off Main Road Kelsale Cum Carlton Suffolk
Discharge of Conditions 9 (tree Fencing Plan), 16 (Archaeology), 19 (Contamination Assessment), 24(Foul Drainage Plan), 28(Construction Site Surface Water management Plan) and 29 (Estate Roads) of DC/18/2621/FUL - Erection of 44 new dwellings with associated access road, see attached letter.