G P Produce Bay 4 Palins Direct The Hill Cromford Derbyshire DE4 3QL
Discharge of conditions 4,6,7,9,10,11,12 and 16 of application no. 20/00071/FUL - Erection of 3no. commercial units (Use Classes E(g) (Offices, Research and Development and Industrial Processes which can be carried out without detriment to the amenity of a Residential Area) and B8 (Storage and Distribution
Unit 3A East Horndon Business Park Tilbury Road West Horndon Brentwood Essex CM13 3LR
Discharge of conditions 6 (Surface water drainage scheme), 7 (Scheme to minimise risk of offsite flooding), 8 (Maintenance Plan) and 12 (Fencing for trees and hedges), of application 22/01751/FUL (Full planning application for the development of a Class B2 / B8 building (industrial and storage and distribution including ancillary office provision), with associated access, vehicle and cycle parking, servicing, landscaping, and infrastructure.)
Roots In The Sky (Site Of The Former Blackfriars Crown Court) 1-15 Pocock Street London Southwark SE1 0BT
Partial discharge of Schedule 8, Part 1, Clause 1.1 'Employment and Skills Methodology' of the Section 106 Agreement attached to planning permision 22/AP/1347, which itself is an amendment of planning permission 20/AP/1537, for: "Development of site, involving part demolition, alterations and extensions to the existing building and basement, including the change of use from Class D1 to Class B1, to provide a seven-storey building with rooftop pavilions comprising: office floorspace (Class B1); retail spaces (Class A1); a cafe (Class A3); a restaurant (B1/A3); a bar (Class A4/B1); leisure uses including a publicly accessible roof terrace (Class D2); other external amenity spaces and landscaping; a new entrance on Loman Street and route through the building; plant, and; other associated works".
Beckett House 60 - 68 St Thomas Street London Southwark SE1 3QU
Discharge of Schedule 8 paragraph 3.1 'Be Seen Energy performance indicators' of the section 106 agreement attached to planning permission ref. 20/AP/0944: 'Redevelopment of the site to include demolition of Becket House and the erection of a 27 storey building with additional level of plant and basement levels in order to provide office use (Class B1), retail (flexible Class A1/A3), cycle parking, servicing, refuse and plant areas, public realm improvements and other associated works incidental to the development.' Agreement ref LEG/RP/PL/S106/RR020/202 LBS reg. 20/AP/0944.
185 Park Street London SE1 9BL
Discharge the notification as set out in Clause 6.1.5 ('Occupation of more than 25% of the Dwellings situated within Block 2 and Block 3) of the Section 106 Agreement ref. LEG/RP/PL/S106/RR020/63762 associated with planning permission ref. 14/AP/3842: Demolition of existing buildings and redevelopment to provide a mixed use development providing three new buildings comprising basement, lower ground and ground floor plus part 9, 14 and 18 storeys (maximum height 19 storeys) containing 163 residential units (Class C3), Office (Class B1), Retail (Class A1/A3/A4), Cultural facility (Class D1/A1/A3/A4); provision of hard and soft landscaping and the provision of parking, servicing and plant areas.
56 - 58 Factory Lane Croydon CR0 3RL
Discharge of condition 4 (landscaping and boundary treatment) attached to planning permission for 21/06012/FUL for demolition of existing buildings and the development of a Class E(g)ii, E(g)iii, B2 and B8 use employment unit with ancillary office accommodation, associated external yard areas, HGV, car parking and cycle parking, servicing areas, external lighting, soft landscaping, infrastructure and associated works.
Site East Of Chear Farm Ely Road Chittering Cambridge Cambridgeshire
To discharge Condition 21 (flood warning and evacuation plan including emergency planning and rescue implications) of decision 21/00360/VARM dated 25th August 2021 for Variation of condition 1 (Approved plans) and 10 (Car parking) of previously approved for the proposed development of four glasshouses, up to 15MW combined heat and power (CHP) plant, two heat storage tanks, two water storage tanks, a packing & distribution unit, cold store, irrigation room and control centre, offices, parking, surface water attenuation lagoons, upgraded access track and other ancillary development
Blotts Barn Brooks Road Raunds NN9 6NS
Discharge of conditions pursuant to 20/00486/FUL - Proposed Commercial Development for a B1 Office Unit and Ancillary Storage Barn at Blotts Barn. Condition 3: b) Written confirmation from Natural England that the application site has been registered with the Great Crested Newt Low Impact Class Licence scheme is submitted. Condition 4: A landscape and ecological management plan (LEMP) is submitted. Condition 8: A written scheme of investigation was agreed with the County Archaeologist and a programme of archaeological work satisfactorily implemented. The associated report, which the County Archaeologist has approved, is provided. Condition 14: Confirmation that the applicant has entered into a S.278 agreement with the Local Highway Authority [to follow]; Condition 18: submission of a Construction Management Plan.
Castleward Including Siddals Road / Canal Street / John Street / Carrington Street / Copeland Street / New Street / Liversage Street Derby
Outline application with Details of Phase 1 to comprise Development of Castleward, involving Demolition of Buildings, Residential Development (Up to 840 Dwellings), Retail (Use Class A1), Restaurant/Cafes (Use Class A3), Offices (Use Class B1), Hotel (Use Class C1), Non-Residential Institutions (Use Class D1), Assembly and Leisure (Use Class D2), School (Use Class D1), Community Centre, (Use Class D1), Bingo Hall (Use Class D2), Alterations to Vehicular Accesses, Formation of Boulevard and Pedestrian Crossing and Refurbishment of Public Realm - Discharge of condition 30 (bat survey) in respect of phase 3B of planning permission 21/00708/VAR
Associated British Ports Port Of Lowestoft Lowestoft Suffolk
Discharge of Condition Nos. 6 of DC/23/2039/FUL - Development of a temporary heat driven Direct Air Capture Demonstrator Plant, comprising a 45m air coloumn and associated mobile office, welfare storage cabin and control room - Construction Management Strategy